首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Premature refusal of large-diameter,deep-penetration piles on an offshore platform
Institution:1. The Civil Engineering Department, Tianjin University, Tianjin, China;2. Center for Offshore Foundation System, The University of Western Australia, Perth, Australia;3. China Oilfield Services Limited, Tianjin, China;1. State Key Laboratory of Subtropical Building Science, South China Institute of Geotechnical Engineering, South China University of Technology, 381 Wushan Road, Guangzhou 510640 China;2. Department of Infrastructure Engineering, Faculty of Engineering and Information Technology, The University of Melbourne, Parkville, Victoria 3010, Australia;3. School of Civil and Mechanical Engineering, Curtin University, Kent Street, Bentley 6102, Australia;1. Faculty of Civil Engineering and Geosciences, Delft University of Technology, Stevinweg 1, 2628 CN Delft, The Netherlands
Abstract:Open-ended pipe piles are commonly driven into the seabed to support offshore platforms. This paper presents a case of practical offshore driven pile installation experiences associating with premature refusal. Pile drivability and capacity are analyzed using sufficient driving records. Dynamic loading tests were performed three months after the driving in order to determine the pile capacity after refusal. The test results are detailed in this paper compared with back analysis of measured pile driving records. Empirical equations are provided to predict soil resistance during driving and after setup according to the driving records and dynamic loading tests. Analyzing this practical engineering case is hoped to lead to a better understanding of pile driving, especially when premature refusal occurs. The sufficient details of the engineering data in this paper are also expected to enrich the engineering experience and literature of offshore piles in offshore engineering.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号