Abstract: | With the using of new full 3 - D interpretative technology, the carefully interpretation of the micro - amplitude structures and faults by the reprocessed 3 -D seismic data in IES (Interactive Exploration System) interpretative system of Sun workstation is obtained. Because of the application of the well - advanced predictive technique for reservoir lithological changes, the predictive accuracy rate of drilling for 31 wells drilled in 1996 achieved 100 % and the economic and social benefits are desirable. |