首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Minimizing dredging disposal via sediment management in New York Harbor
Authors:Karim A Abood  Susan G Metzger  Donald F Distante
Institution:1. Environmental Science & Engineering Consultants, One Blue Hill Plaza, 10965, Pearl River, New York
2. United Water New York, 360 West Nyack Road, 10994, West Nyack, New York
Abstract:The Port of New York/New Jersey is naturally shallow, and therefore dredging is required to maintain depths necessary for navigation. About six million cubic yards of material must be dredged annually to maintain navigation channels and berthing areas. Opportunities for disposal of dredged materials in the metropolitan region are limited. The existing ocean disposal site that has, until recently, received the majority of dredged materials is nearing capacity. Under the new, more stringent, guidance for ocean disposal, a large percentage of the dredged material is not considered acceptable for ocean disposal because of contamination. This paper explores nondredging alternatives to reduce the volume of materials to be dredged, thus reducing the disposal volume. These alternatives include short-term options (e.g., reprofiling operations, in which sediments from high spots in berths are dragged to depressions in lower spots) and long-term sedimentation minimization options (e.g., subsurface berms or air bubblers deployed around berths and interpier areas). These methods require an understanding of sedimentation/circulation patterns of the harbor as a whole and the local area in which the specific methodology may be employed.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号