GPS测量在铁路施工控制网中的应用
引用本文:丁海鹏,杨云鸿,李如仁.GPS测量在铁路施工控制网中的应用[J].中国煤炭地质,2010(2):64-66.
作者姓名:丁海鹏  杨云鸿  李如仁
作者单位:[1]东北煤田地质局勘察设计研究总院,辽宁沈阳110013 [2]中国水电第十四工程局有限公司,云南昆明655000 [3]辽宁工程技术大学,辽宁阜新123000
摘    要:白浩铁路一期工程线路自桑锡线的白音库伦车站引出,直至门迪诺尔,全线长约52.253km。根据野外施工条件采用GPS定位技术进行E级网平面控制测量,高程控制采用几何水准方法,在施测时加测一个临时点以增加图形强度。测量施工采用4台S82-2008双频GPS接收机按静态观测方法进行同步观测,观测时间控制在45min~60min。根据GPS网平差后坐标和点位精度分析,该项勘测工程控制网设计与施工措施合理,测量结果满足规范所规定的各项限差要求。白浩铁路一期工程GPS施测控制网的布设方法为GPS在沙漠地区特殊条件下的应用提供了一成功例证。

关 键 词:测量  GPS定位技术  控制网  静态观测方法  同步观测  白浩铁路

Application of GPS Surveying in Railway Construction Control Network
Ding Haipeng,Yang Yunhong,Li Ruren.Application of GPS Surveying in Railway Construction Control Network[J].Coal Geology of China,2010(2):64-66.
Authors:Ding Haipeng  Yang Yunhong  Li Ruren
Institution:1. Exploration, Design and Research Institute, Northeast China Bureau of Coal Geological Exploration, Shenyang, Liaoning 110013; 2. The 14th Engineering Bureau, Sinohydro Corporation, Kunming, Yunnan 655000; 3. Liaoning Technical University, Fuxin, Liaoning 123000)
Abstract:The first-stage construction of the Bayin Hure-Holai Hure railway is led off from the Bayin Hure station on the Sanggin Dalai-Xilinhot railway straight to the Mendi Nut with full length about 52.253km. Based on field constructional conditions, the GPS positioning technology is used in the E grade network horizontal control survey, geometrical leveling in vertical control, one provisional point is added in surveying to enhance the strength of figure. 4 S82-2008 dual-frequency GPS receivers are used in static simultaneous observations, 45min-60min observation times are controlled. Based on GPS network error compensated coordinate and point position accuracy analyses, the control network design and operational measures of the surveying engineering are deemed to be reasonable, and the results can meet code specified each tolerance requirement. The GPS survey control network layout method in Bayin Hure-Holai Hure railway first-stage construction has provided a successful example for the application of GPS under the particular conditions in desert areas.
Keywords:survey  GPS positioning technology  control network  static observation method  simultaneous observations  Bayin Hure- Holai Hure railway