基于RFPA3D和微震监测的白鹤滩水电站左岸边坡稳定性分析
引用本文:杨莹,徐奴文,李韬,戴峰,樊义林,徐剑,李彪.基于RFPA3D和微震监测的白鹤滩水电站左岸边坡稳定性分析[J].岩土力学,2018,39(6):2193-2202.
作者姓名:杨莹  徐奴文  李韬  戴峰  樊义林  徐剑  李彪
作者单位:1. 四川大学 水力学与山区河流开发保护国家重点实验室,四川 成都 610065;2. 中国长江三峡集团公司,北京 100038
基金项目:国家重点基础研究发展计划(973计划)(No.2015CB057903);国家自然科学基金面上项目(No.51374149);教育部新世纪优秀人才(No.NCET-13-0382)。
摘    要:白鹤滩水电站左岸边坡受缓倾角软弱面及NW向断层影响,施工、运行期的边坡稳定性问题尤为重要。为研究左岸边坡在开挖卸荷过程中应力场、位移场分布规律,揭示岩体内部破坏失稳机制,利用RFPA3D(realistic failure process analysis)软件以拱轴线剖面为例建立准三维数值模型,再现坝基边坡岩体裂隙萌生、发育、扩展直至贯通的渐进损伤破坏过程。结合左岸边坡开挖卸荷及应力调整过程中的微震活动演化特征,圈定工程边坡潜在危险区域,探讨可能的失稳破坏模式。分析表明:基于离心加载法计算得到工程边坡开挖后安全系数为1.33;边坡表层区域受缓倾角错动带控制,变形破坏最为明显,以小范围楔形体滑移为主。该研究结果可为白鹤滩水电站坝基边坡后期施工提供依据,对于类似岩质边坡工程施工具有一定的指导作用。

关 键 词:岩石边坡  微震监测  稳定性  数值模拟  白鹤滩水电站  
收稿时间:2016-09-14

Stability analysis of left bank rock slope at Baihetan hydropower station based on RFPA3D software and microseismic monitoring
YANG Ying,XU Nu-wen,LI Tao,DAI Feng,FAN Yi-lin,XU Jian,LI Biao.Stability analysis of left bank rock slope at Baihetan hydropower station based on RFPA3D software and microseismic monitoring[J].Rock and Soil Mechanics,2018,39(6):2193-2202.
Authors:YANG Ying  XU Nu-wen  LI Tao  DAI Feng  FAN Yi-lin  XU Jian  LI Biao
Institution:1. State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu, Sichuan 610065, China; 2. China Three Gorges Corporation, Beijing 100038, China
Abstract:The stability of the left bank slope at Baihetan hydropower station is especially important in the construction and operation periods, due to the influences of the dislocation interfaces with a slightly-inclined angle and NW directional faults. In this study, the quasi-three-dimensional numerical model was established by using the realistic failure process analysis (RFPA3D) software with the arch axis profile as an example. Then the stress distribution field and displacement field of the left bank slope were studied during excavation unloading process, and the rock failure mechanism was revealed. In addition, this study analysed the initiation, propagation, extension and interaction mechanisms of microcracks during the progressive failure process. By combining with the distribution of microseismic events during excavation unloading and stress adjustment on the left bank slope, the potentially dangerous parts of the engineering were delineated, and the possible failure modes of the slope were explored. The results showed that the safety factor of the slope after excavation was 1.33 calculated with the centrifuge loading method. It was found that the most obvious deformation and failure of the slope surface were controlled by the inclined dislocation interfaces. Meanwhile, the wedge-shaped sliding within a small scale played a dominant role in the damaged zone. This study provides references for the later construction of the left bank slope and practical guidance for constructing similar rock slopes.
Keywords:rock slope  microseismic monitoring  stability  numerical simulation  Baihetan hydropower station  