首页 | 本学科首页   官方微博 | 高级检索  
     检索      

重庆测震台网运行率提高措施
引用本文:李强,郑许东,刘黎,王琳.重庆测震台网运行率提高措施[J].地震地磁观测与研究,2013(5):244-247.
作者姓名:李强  郑许东  刘黎  王琳
作者单位:[1]重庆市地震局,中国重庆401147 [2]巫溪县地震局,中国重庆405800
摘    要:开展稳定的电力保障、台站避雷到位保护、双链路互备传输数据及科学合理的运行维护等措施,可有效提高重庆测震台网运行率,具有较高的应用价值.

关 键 词:重庆测震台网  运行率  有效措施

Effective measures to increase the running rate of Chongqing Seismic Network
Li Qiang,Zheng Xudong,Liu Li,Wang Lin.Effective measures to increase the running rate of Chongqing Seismic Network[J].Seismological and Geomagnetic Observation and Research,2013(5):244-247.
Authors:Li Qiang  Zheng Xudong  Liu Li  Wang Lin
Institution:1.Earthquake Administration of Chongqing Municipality, Chongqing 401147, China; 2.Earthquake Administration of Wuxi County, Chongqing 405800, China;)
Abstract:In this paper,the following four aspects for effectively improving the run rate of Chongqing Seismic Network:stable electricity supply,effective lightening protection,dual link backup during the data transmission,and the scientific and reasonable operation and maintenance are summarized.These measurements are worth to learn by the other seismic networks.
Keywords:Chongqing Seismic Network  run rate  effective measures
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号