首页 | 本学科首页   官方微博 | 高级检索  
     检索      

建筑基坑土钉支护时机探讨
引用本文:范永波,杨素春,胡社荣.建筑基坑土钉支护时机探讨[J].水文地质工程地质,2006,33(1):5-7.
作者姓名:范永波  杨素春  胡社荣
作者单位:1. 中国矿业大学资源与安全工程学院,北京,100083
2. 北京城建设计研究总院岩土工程所,北京,100038
摘    要:本文采用FLAC软件,通过建筑物基坑随开挖深度增加而变形的模拟,得出基坑每一阶段开挖及土钉支护条件下的位移发展演变规律,跟踪最大不平衡力变量的变化提出了最佳土钉支护时机。

关 键 词:数值模拟  最佳土钉支护时机  最大不平衡力
文章编号:1000-3665(2006)01-0005-03
收稿时间:2005-01-27
修稿时间:2005-10-25

Discussion of soil nailing time in foundation supporting
FAN Yong-bo,YANG Su-chun,HU She-rong.Discussion of soil nailing time in foundation supporting[J].Hydrogeology and Engineering Geology,2006,33(1):5-7.
Authors:FAN Yong-bo  YANG Su-chun  HU She-rong
Abstract:In this paper, the authors carried out a numerical simulation towards deformation along with the excavation using FLAC^3D. We obtained the rule of the displacement distribution under the condition of excavation and soil nail supporting, at the same time we put forward the best time of the soil nail supporting according to the change of the maximal unbalanced force.
Keywords:numerical simulation  best time of soil nail supporting  maximal unbalanced fore
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号