摘    要:采用有限元方法反演某水电站地下厂房厂区初始地应力场。采用Zienkiewicz-Pande的双曲线屈服准则,对某水电站地下厂房洞室群的开挖过程进行了三维弹塑性有限元模拟。为反映锚固支护对围岩的加固作用和评价地下厂房洞室群支护参数的合理性,提出了可以考虑抗剪作用的隐式锚杆单元和可以考虑预应力效果隐式锚索单元。计算结果表明,该洞室群在洞室布局、开挖顺序和支护参数等方面是合理的,各主要洞室群的稳定性总体较好。

关 键 词:地应力反演  弹塑性有限元  围岩稳定  隐式锚杆锚索单元  
文章编号:1000-7598-(2004)12-1955-06
收稿时间:2003-09-28
修稿时间:2003年9月28日

Stability analysis of surrounding rock of underground openings of a hydropower station
YU Wei-ping,GENG Ke-qin,WANG Xiao-gang.Stability analysis of surrounding rock of underground openings of a hydropower station[J].Rock and Soil Mechanics,2004,25(12):1955-1960.
Authors:YU Wei-ping  GENG Ke-qin  WANG Xiao-gang
Institution:Department of Geotechnical Engineering, China Institute of Water Resources and Hydropower Research, Beijing 100044, China
Abstract:Finite element method(FEM)is adopted to back analyze initial geostress field around the underground power houses of a hydropower station. Three-dimensional elastoplastic finite element analysis is performed for the simulation of excavating of the underground power houses excavations by using hyperbola yield criterion of Zienkiewicz-Pande. In order to reflect the solidification effect on surrounding rock by anchorage and to evaluate rationality of underground openings’ support parameters, a new element mode, which can take the shearing-resistant effect of bolt and the prestressing force of anchorage cable into account, is presented. The finite element calculation result shows that the openings’ layout, construction sequence and support parameters are rational, main openings are stable well.
Keywords:back analysis of initial geostress  elastoplastic finite element  stability of surrounding rock  implicit element of bolt and  anchorage cable