首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Recent progress on the Columbus Project and the Miror Laboratory program
Authors:J R P Angel  J M Hill  H M Martin  P A Strittmatter
Institution:(1) Steward Observatory, University of Arizona, Tucson, USA
Abstract:This paper summarizes recent advances on the Columbus Project telescope and in the University of Arizona Mirror Lab. The Columbus telescope structure has been re-optimized to allow rapid changes between foci, while still maintaining high rigidity. Room has been made to translate secondary and tertiary spiders out of the light path to the center. A bill allowing construction of the telescope on Mt. Graham, Arizona, has been passed by Congress and signed into law. Two alternative enclosure designs, one with a co-rotating building and a second which opens like a flower, are being explored.A common baseline design for the 8 m honeycomb mirrors for both the Columbus and Magellan telescopes has been developed. It has stiffness comparable to that of the Palomar 200 inch mirror. The Mirror Lab has successfully cast two 3.5 m honeycomb blanks and expects to begin casting at the 6.5 and 8 m scale at the end of 1990. Interferometric tests of the Vatican f/1 1.8 m borosilicate honeycomb mirror show good stability of figure with the air jet ventilation system. A 60 cm stressed lap has been completed, and will be used to parabolize this mirror which is now polished as an f/1 sphere. Plans for a polishing facility to house two 8 m machines and a test tower are complete, with construction starting in April 1989.Paper presented at the Symposium on the JNLT and Related Engineering Developments, Tokyo, November 29–December 2, 1988.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号