首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Study of blasting vibrations in Sarcheshmeh copper mine
作者姓名:K.  Najm  A.  Javaherian  H.  B.  Amnieh  
作者单位:K. Najm1) A. Javaherian2) H. B. Amnieh1) 1) Department of Mining,Metallurgy and Petroleum Engineering,Amirkabir University,Tehran,I R Iran 2) Institute of Geophysics,Tehran University,Tehran,I R Iran
摘    要:Introduction In spite of development of mechanized methods of ground excavation, drilling and blasting is still extensively employed because of its low capital investment and simplicity. Its extensive use is not even limited by extension of mines close to residential areas and vital establishments. If it is not used in a controlled way, blasting operation can cause instability, failure of mine slopes and damps and damage to the nearby structures. The main objective here could be to reduce the …

收稿时间:27 June 2001
修稿时间:14 April 2002

Study of blasting vibrations in sarcheshmeh copper mine
K. Najm A. Javaherian H. B. Amnieh .Study of blasting vibrations in Sarcheshmeh copper mine[J].Acta Seismologica Sinica(English Edition),2002,15(6):683-690.
Authors:KNajm  AJavaherian  HBAmnieh
Institution:1. Department of Mining, Metallurgy and Petroleum Engineering, Amirkabir University, Tehran, I R Iran
2. Institute of Geophysics, Tehran University, Tehran, I R Iran
Abstract:Ground vibration is one of the side effects of blasting, in which way considerable amount of explosive energy is exhausted, and causes decrease in production and even decline in mine development workings. In this study, 57 recorded 3-C seismograms from 11 blasts in Sarcheshmeh copper mine, Kerman, Iran, are processed and analyzed. These data were recorded by digital seismograph PDAS-100 and analyzed by DADISP software. Finally, blasting parameters, such as explosive weight and type, distance between the structures and blasting site, blasting delays, affecting ground vibration are reviewed and their influence on peak particle velocity (PPV) are studied. Based on this study, suitable detonation delays and explosive type is determined. Considering these data, a graph of PPV versus scaled distance for Sarcheshmeh copper mine is prepared, by the help of which, safe distance for structures and accordingly explosive quantity could be determined.
Keywords:ground vibration  peak particle velocity  blasting
本文献已被 CNKI 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号