Multi-aquifer pumping test to determine cutoff wall length for groundwater flow control during site excavation in Tokyo, Japan
Authors:Noriharu Miyake  Nobuaki Kohsaka  Akira Ishikawa
Institution:(1) Shimizu Corporation, 4-17, Echujima 3-chome, Koto-ku 135-8530, Tokyo, Japan
Abstract:Multi-aquifer pumping tests, using a multi-screen pumping well and multi-level piezometers, were carried out for groundwater flow control in a large-scale excavation site in Tokyo, Japan. The site was underlain by multi-layered confined aquifers. In the tests, pumping was carried out using a multi-aquifer pumping well in which a screen depth was chosen arbitrarily. Changes in groundwater pressure heads in each aquifer were measured at each screen position of the multi-aquifer pumping well. Hydraulic conductivity (K) and specific storage (S s) of not only aquifers, but also for low permeability layers between the aquifers, were estimated using the Cooper-Jacob method, and calibrated by a finite element method (FEM) groundwater model. Four different cutoff wall lengths were assumed for final excavation depth, and correlations among wall length, pumping discharge and drawdown at the back of the cutoff wall were obtained from simulations using the K and S s parameters in the FEM model. Then, the most suitable wall length was selected based on the simulated correlations considering environmental condition, construction period and cost of the cutoff wall.
Keywords:Cutoff wall  Groundwater exploration  Pumping test  Groundwater flow  Japan
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号