福建省滨海火电厂地质灾害问题及风险控制探讨
引用本文:郑承忠.福建省滨海火电厂地质灾害问题及风险控制探讨[J].中国地质灾害与防治学报,2005,16(2):47-52.
作者姓名:郑承忠
作者单位:福建海洋研究所,福建,厦门,361012
摘    要:滨海火力发电厂工程主要包括厂区建筑、码头、管道、取排水、填海和贮灰场等工程。其主要面临着福建省海岸带构造运动、断裂及地震活动、港湾淤积、海底滑坡、软土地基、海底活动地貌、基岩不均匀风化以及人类工程活动等主要的灾害性地质因素。通过对这些因素潜在的致灾特点分析,提出了滨海火电厂地质灾害风险控制应包括选址阶段地质灾害风险回避、设计施工阶段地质灾害风险处理及运行阶段地质灾害风险监控等3方面。地质灾害风险评估是滨海火电厂地质灾害风险控制的首要任务。针对滨海电厂工程的特点,评估内容应着重于地质灾害危险性评估及易损性评估。选址阶段地质灾害风险回避主要是对构造不稳定的回避。地质灾害风险处理主要是电厂工程的基础处理及管道抗冲刷处理。电厂运行阶段地质灾害风险监控主要是对建筑物基础稳定性及海域冲淤变化的监控。

关 键 词:灾害地质问题  地质灾害  风险控制  危险性及易受损性评估  福建省滨海火电厂
文章编号:1003-8035(2005)02-047-06
修稿时间:2004年4月12日

Discussion on geological hazards and risk controlling of thermal power plants in coastal area in Fujian Province
ZHENG Cheng-zhong.Discussion on geological hazards and risk controlling of thermal power plants in coastal area in Fujian Province[J].The Chinese Journal of Geological Hazard and Control,2005,16(2):47-52.
Authors:ZHENG Cheng-zhong
Abstract:The main engineering projects of the thermal power plants comprise of plant buildings, wharf, sea floor conduit, water taking and ejecting, retaining wall, and store of dregs, and they are up against the main geological hazard factors such as tectonics movement, fault and earthquake, estuarine deposit, soft groundsill, moving physiognomy of sea floor, ununiformity weathering of rock, and artificial engineering action, etc. By analyzing their potential hazard characters, the author proposes that the main risk controlling of geological hazards of thermal power plants must include the risk obviation at the stage of the site choosing, the risk treatment at the stage of designing and constructing, and the risk monitoring at the stage of running. The risk assessment of geological hazards is the principal task of the risk controlling of geological hazard. Aiming at the characteristics of the engineering projects of thermal power plants, the assessment must be emphasized on the fatalness and vulnerability to damage of geological hazards. The geological hazard risk obviation in stage of the site choosing is mainly to avoid the labilization of tectonics. The geological hazard risk controlling is mainly the foundation disposal of power plants projects and the resisting eroding of sea floor conduit. The geological hazard risk monitoring in stage of operation is chiefly to monitor the foundation stability of buildings and the changing of sea floor deposition.
Keywords:hazardous geological problems  geological hazard  risk controlling  assessment on risk and vulnerability to damage  thermal power plant in coastal area of Fujian Province