荔湾3-1上部组块浮托安装实测研究
引用本文:张鼎,陈刚,杨建民,李欣,江新伟.荔湾3-1上部组块浮托安装实测研究[J].海洋工程,2014,32(6):31-40.
作者姓名:张鼎  陈刚  杨建民  李欣  江新伟
作者单位:1. 上海交通大学 海洋工程国家重点实验室,上海,200240
2. 海洋石油股份有限公司,天津,300452
基金项目:海洋工程国家重点实验室自研基金资助项目
摘    要:随着海洋资源的开采走向深海,海上平台需要面对更加恶劣的海洋环境,因此,需要平台的质量更大,结构更强。而如何安装这些大型平台成为工程施工的重要挑战。浮托安装法是大型平台安装的一种十分有发展前景的安装方法,在浮托安装过程中进行实时监测,可以为浮托安装提供直接的信息反馈,保障安装的顺利进行。以荔湾3-1浮托安装为例,讨论了浮托安装过程中用到的实测技术,主要包括:浮托驳船及组块插尖的六自由度运动监测;施工海域海洋气象条件监测——风、浪、表面流和潮位;浮托驳船两侧护舷的载荷监测。并通过对实测结果进行综合分析,给出可靠的实测数据,为对比理论计算和模型试验,检验预报方法的可靠性提供支持。

关 键 词:浮托安装  实测  运动监测  环境监测  护舷载荷监测  南中国海  荔湾3-1

Field measurement of Liwan 3-1 topside float-over installation
ZHANG Ding,CHEN Gang,YANG Jian-min,LI Xin and JIANG Xin-wei.Field measurement of Liwan 3-1 topside float-over installation[J].Ocean Engineering,2014,32(6):31-40.
Authors:ZHANG Ding  CHEN Gang  YANG Jian-min  LI Xin and JIANG Xin-wei
Institution:State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong University, Shanghai 200240, China;State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong University, Shanghai 200240, China;State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong University, Shanghai 200240, China;State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong University, Shanghai 200240, China;Offshore Oil Engineering Co., Ltd., Tianjin 300452, China
Abstract:With the exploitation of oil and gas in the deep water, the offshore structures need to face the harsh ocean environment, and larger and stronger offshore structures are needed. However, one of the challenges for these large structures is their installation process. Float-over method is one of prospective methods to solve the problem for these large structures. Real-time monitoring technology can provide direct feedback to the installation project, and guarantee the success of the installation. A comprehensive field measurement program was carried out on Liwan 3-1 platform during its float-over installation. The motions of barge and stabbing cones and the stress of sway fenders, as well as the environment data including waves, swells, current, wind and tide, were monitored. This paper summarizes how the measurements were performed. Through the analysis, reliable data are derived from filed measurement, which could be used to compare with those derived from numerical simulation and model tests in order to evaluate the reliability of these methods.
Keywords:float ̄over installation  field measurement  6 ̄degree ̄of ̄freedom motion measurement  environment measurement  fenders loading measurement  South China Sea  Liwan 3 ̄1