首页 | 本学科首页   官方微博 | 高级检索  
     检索      

抚顺石油一厂地表变形分析
引用本文:孙立云,吕鑫.抚顺石油一厂地表变形分析[J].测绘工程,2009,18(5):73-76,80.
作者姓名:孙立云  吕鑫
作者单位:辽宁省有色地质局一○一队,辽宁,抚顺,113015
摘    要:抚顺西露天矿矿坑总面积15 km^2,开采深度400 m,正是这据称地球人工挖掘的最大的坑,却给位于其北侧的石油一厂带来巨大的安全隐患。文中取最近5年的监测资料,对其技术纲要、工作基点的布设与测量、变形监测方法、数据处理及其成果进行分析,得出几点结论并提出建议。

关 键 词:矿坑  浑河断裂  变形监测  数据处理分析

Analysis of the surface deformation in No. 1 Factory of Fushun Petrochemical Company Petroleum
SUN Li-yun,LV Xin.Analysis of the surface deformation in No. 1 Factory of Fushun Petrochemical Company Petroleum[J].Engineering of Surveying and Mapping,2009,18(5):73-76,80.
Authors:SUN Li-yun  LV Xin
Institution:101 Geological Team, Non-ferrous Geology Bureau of Liaoning Province, Fushun 113015, China)
Abstract:Fushun West Open-pit Mine is about 15 square km and 400 miles mining depth,which is the biggest artificial mine in the world,and brings the great hidden trouble to the safety of the No.1 Factory.According to the monitoring information of the last five years,the paper analyses its technological program,the arrangement and the survey of the datum point,the deformation monitoring methods,the data processing and its achievement.And we can get the conclusion and the proposal.
Keywords:Open-pit Mine  the Fault of Hunhe River  the monitor of the deformation  data processing and analysis
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号