Abstract: | In order to preserve the storage capacity of the Nanqin Reservoir for long-term service, several remedial measures have been worked out: (a) measures to control the upstream extension of backwater deposits and to prevent gravel bed load from entering into the reservoir, so that no armour layer will be formed; (b) sediment sluicing by density current to reduce deposits of suspended load; (c) periodical sediment flushing by emptying reservoir to restore the effective storage capacity. In addition, conceptions of flood plain elevation in reservoir, storage volume required in the routing of turbid flow (density flow), the storage capacity that can be restored after being lost by deposition, and the storage volume for sediment regulation are also discussed. |