首页 | 本学科首页   官方微博 | 高级检索  
     检索      

植物与岩土措施相结合的泥石流治理工程(英文)
引用本文:崔鹏,林勇明.植物与岩土措施相结合的泥石流治理工程(英文)[J].资源与生态学报(英文版),2013,4(2):97-104.
作者姓名:崔鹏  林勇明
作者单位:[1]中国科学院成都山地灾害与环境研究所山地灾害与地表过程重点实验室,成都610041 [2]福建农林大学林学院,福州350002
基金项目:Foundation: this research was supported by the National Key Fundamental Research (973) Project (2011 CB409902), the NSFC project (41030742), and the NSFC project (41201564).
摘    要:我国山区特殊的地形、地质及气候条件造成泥石流灾害频繁发生,严重危害居民生命财产安全并限制山区经济社会可持续发展。国内外泥石流防治研究取得显著成效,但还需要研究如何合理搭配治理措施以满足泥石流防治的需求。本文简要介绍我国泥石流防治技术,主要内容有综合防治技术体系、植物工程措施、岩土工程措施、以及植物工程措施与岩土工程措施的有机结合。探讨了以主河输沙能力为控制条件,以地理条件和微地形因子为植物种类选择依据,坡面治理与沟道拦蓄配合,形成"坡面——沟道——小流域"的多级径流和固体物质调控体系。为了做好泥石流防治工作,今后应该加强植物措施治理泥石流的机理研究,评价植物措施的功能并编制设计技术规范,完善植物工程措施与岩土工程措施结合的综合治理体系。

关 键 词:泥石流  灾害  防治技术  植物工程措施  岩土工程措施
收稿时间:2012-11-03

Debris-flow Treatment: The Integration of Botanical and Geotechnical Methods
CUI Peng,LIN Yongming.Debris-flow Treatment: The Integration of Botanical and Geotechnical Methods[J].Journal of Resources and Ecology,2013,4(2):97-104.
Authors:CUI Peng  LIN Yongming
Institution:1.Key Laboratory of Mountain Hazards and Earth Surface Process, Institute of Mountain Hazards and Environment, CAS, Chengdu 610041, China;2.College of Forestry, Fujian Agriculture and Forestry University, Fuzhou 350002, China
Abstract:Due to special topographical, geological and meteorological conditions, debris flows occur frequently and result in heavy losses of lives and properties in mountainous areas, which become a great threaten to the sustainable development of regional economy and society in western China. At present, debris-flow prevention has performed well in many mountainous countries and has made headway in early warning, disaster mitigation by structural engineering methods, and risk analysis and management. In this paper, debris-flow prevention techniques have been introduced from the aspects of botanical methods, geotechnical engineering methods, and synthetic prevention system based on the above two methods. In addition, the treatment system of multilevel runoff and unconsolidated soil in the catchment with a chain of "slope-gully-valley" is set up in consideration of sediment load of main rivers, incorporation of slope improvement and gully retention, as well as micro-site factors for matching species with the site. Furthermore, attentions should be paid to the mechanism and technical details of vegetation measures for debris-flow prevention, as well as effective incorporation between botanical method and geotechnical method.
Keywords:debris flow  hazard  prevention  botanical method  geotechnical method
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《资源与生态学报(英文版)》浏览原始摘要信息
点击此处可从《资源与生态学报(英文版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号