首页 | 本学科首页   官方微博 | 高级检索  
     检索      

TSP-203系统数据采集的改进方案
引用本文:何刚,沙椿,丁陈奉,陈波.TSP-203系统数据采集的改进方案[J].地球物理学进展,2006,21(4):1332-1337.
作者姓名:何刚  沙椿  丁陈奉  陈波
作者单位:中国水电建设顾问集团成都勘察设计研究, 成都 610072
基金项目:中国水电集团《TSP-203系统在雪峰山隧道超前地质预报的应用研究》项目资助
摘    要:TSP-203系统(Tunnel Seismic Prediction System)是针对复杂地质条件设置的隧道挖掘超前地质预报系统,目前广泛应用.该系统从数据采集、处理和成果评估高度智能化,采用该系统可以预报隧道工作面前方至少100m围岩地质体的性质、位置和规模,并可算出其岩石物理力学参数,为确定合理的支护参数提供依据,提高了隧道施工安全和质量.本文针对TSP-203系统的野外工程中遇到的精度和勘探成本问题,根据石油地震勘探的理论方法,考虑系统观测的激发和接收两大因素,提出系统数据采集的改进方法:1)在信号激发方面提出组和爆炸方法;2)在针对信号接受方面提出传感器新的安装改进方法.

关 键 词:TSP-203系统  反射波  掌子面  超前地质预报
文章编号:1004-2903(2006)04-1332-06
收稿时间:2005-08-10
修稿时间:2005-11-20

Investigation on data acquisition application of TSP-203 system
HE Gang,SHA Chun,DING Cheng-fen,CHEN Bo.Investigation on data acquisition application of TSP-203 system[J].Progress in Geophysics,2006,21(4):1332-1337.
Authors:HE Gang  SHA Chun  DING Cheng-fen  CHEN Bo
Abstract:Accompanying with the construction of our country,the quantity and the difficulties of tunnel engineering are becoming more and more.There will be accident because of the ambiguous geologic information in front of the tunnel face.Tunnel Seismic Prediction System(TSP-203 system)is designed for these problems,which is excellent intelligence in data acquisition,processing and evaluation.This system can predict at least l00m in ahead of the tunnel face where the kinds,locations and sizes of geologic blocks,and evaluate rock mechanical parameters.For this reason,it can confirm the evidence for reasonable timbering parameters,and ensure the quality and safety in tunnel operations.In this text,improvement opinions on data acquisition were brought out based on the petroleum earthquake exploring for enhancing the precision in the actual operation of data acquisition outside.
Keywords:TSP-203(Tunnel Seismic Prediction System)  reflection wave  tunnel face  geologic advanced predicting
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《地球物理学进展》浏览原始摘要信息
点击此处可从《地球物理学进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号