核电工程应用隔震技术的可行性探讨
引用本文:谢礼立,翟长海.核电工程应用隔震技术的可行性探讨[J].地震工程与工程振动,2012,32(1):1-10.
作者姓名:谢礼立  翟长海
作者单位:1. 中国地震局工程力学研究所,黑龙江哈尔滨150080;哈尔滨工业大学土木工程学院,黑龙江哈尔滨150090
2. 哈尔滨工业大学土木工程学院,黑龙江哈尔滨,150090
基金项目:地震行业科研专项经费项目(201208013);中国工程院咨询研究项目(2011-XZ-25)
摘    要:本文旨在观察和分析有关基底隔震技术在核电工程中应用的相关问题,重点讨论如何将此类已经相当成熟的技术应用于核电这一类十分特殊、十分重要、十分敏感而又十分复杂的工程中.文中指出隔震技术有很多优点,可以整体改进核电工程的安全性和可靠性,有利于促进未来核电厂设计和建造的标准化,缩短建设时间,降低建厂的初始投资和生命周期中的运行...

关 键 词:核电工程  核电厂  基底隔震  质量保证和质量控制  整体隔震  抗震设计  超限设计

A prospective study on applicability of base isolation in nuclear power plants
XIE Lili , ZHAI Changhai.A prospective study on applicability of base isolation in nuclear power plants[J].Earthquake Engineering and Engineering Vibration,2012,32(1):1-10.
Authors:XIE Lili  ZHAI Changhai
Institution:1.Institute of Engineering Mechanics,China Earthquake Administration,Harbin 150080,China; 2.School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China)
Abstract:This paper is to review the present-status of application of seismic base isolation in nuclear power plant(NPP),discuss the related issues of applicability of this technology to NNP structures characterized by the particular importance,special sensitivity and very complicated configuration,and look into the prospect of NPP provided with the seismic base isolation.It is pointed out that the base isolation is a mature technology that can benefit the NPP in resisting the potential severe earthquake and facilitating the standardization of NPP design and construction,as well as reducing the initial and life-cycle cost.It is also emphasized that there are still a number of bottle-neck problems in base-isolation to be solved to receive the acceptance from the NPP industry and regulatory for deployment in the NPPs.
Keywords:seismic base isolation  nuclear power industry  nuclear power plant  quality-guarantee and quality-control  beyond design ground-motion