首页 | 本学科首页   官方微博 | 高级检索  
     检索      

多通道大功率电法勘探仪集成试验
引用本文:底青云,雷达,王中兴,张一鸣,王顺,张启卯,张文伟,欧阳涛.多通道大功率电法勘探仪集成试验[J].地球物理学报,2016,59(12):4399-4407.
作者姓名:底青云  雷达  王中兴  张一鸣  王顺  张启卯  张文伟  欧阳涛
作者单位:1. 中国科学院地质与地球物理研究所 中国科学院页岩气与地质工程重点实验室, 北京 100029; 2. 北京工业大学, 北京 100022; 3. 中国科学院电子学研究所, 北京 100190; 4. 中国科学院大学, 北京 100049
基金项目:国家重大科研装备研制项目“深部资源探测核心装备研发”(ZDYZ2012-1)-05子项目“多通道大功率电法勘探仪”项目资助.
摘    要:采用自主研发的多通道大功率电法勘探仪进行了深部矿勘探测试.首先在河北省张家口市张北县进行了仪器整体的调试和波形测试等试验,试验结果表明,在大偏移距情况下,尽管存在50 Hz电磁干扰,也能获得与发射波形相关的波形曲线,验证了仪器系统的正确性和稳定性.然后在内蒙古曹四夭钼矿区采集了4.8km的剖面数据,并进行了相应的数据处理工作.对所采集的数据进行了大地脉冲响应计算、峰值时刻提取和视电阻率计算,以及电阻率二维反演工作,反演的的电阻率断面结构与已知地质资料相吻合,验证了数据流程和处理方法的正确性.此次多通道大功率电法勘探仪的成功集成,为进一步大规模比对试验和装备整装勘探打下了基础.

关 键 词:多通道大功率电法勘探仪  集成试验  大地脉冲响应  
收稿时间:2016-02-04

An integrated test of the multi-channel transient electromagnetic system
DI Qing-Yun,LEI Da,WANG Zhong-Xing,ZHANG Yi-Ming,WANG Shun,ZHANG Qi-Mao,ZHANG Wen-Wei,OUYANG Tao.An integrated test of the multi-channel transient electromagnetic system[J].Chinese Journal of Geophysics,2016,59(12):4399-4407.
Authors:DI Qing-Yun  LEI Da  WANG Zhong-Xing  ZHANG Yi-Ming  WANG Shun  ZHANG Qi-Mao  ZHANG Wen-Wei  OUYANG Tao
Institution:1. Key Laboratory of Shale Gas and Geoengineering, CAS, Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029, China; 2. Beijing university of technology, Beijing 100022, China; 3. Institute of Electronics, Chinese Academy of Sciences, Beijing 100190, China; 4. University of Chinese Academy of Sciences, Beijing 100049, China
Abstract:Independent development of a multi-channel transient electromagnetic (M-TEM) system has entered the instrument integration stage. Firstly, the debugging and the waveform measurement of the instrument have been successfully conducted in Zhangbei county, Hebei Province. In the case of large offset, at the presence of the 50Hz electromagnetic interference, it can get a good correlation with emission waveform for received curves, which shows that the overall performance of the instrument is stable. Afterwrads, the experimental test was carried out at a Mo mine of Caosiyao, Inner Mongolia. The 4.8 km profile data were acquired and processed, followed by picking peak times and calculating apparent resistivity from recorded data, and 2D inversion conducted. The shape of 2D inversion section is in agreement with the known geological data. These have laid the foundation for the large-scale comparive test and equipment exploration in the subsequent work.
Keywords:Multi channel transient electromagnetic system  Integrated test  Earth response
本文献已被 CNKI 等数据库收录!
点击此处可从《地球物理学报》浏览原始摘要信息
点击此处可从《地球物理学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号