首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Sub-Daily Earth Rotation Parameters and the International GPS Service Orbit/Clock Solution Products
Authors:Kouba  Jan
Institution:(1) Geodetic Survey Division, Natural Resources Canada, 615 Booth Street, Ottawa, K1A0E9, Canada
Abstract:Tidally induced sub-daily Earth Rotation Parameters (ERP) variations, when not properly accounted for, can cause apparent orbit and ERP rate errors, which can significantly exceed the IGS solution errors. All International GPS Service (IGS) Analysis Centers currently apply the conventional sub-daily ERP model in their transformations from ITRF (International Terrestrial Reference Frame) to ICRF (International Celestial Reference Frame), both of which are used for IGS global analyses. However, some IGS Analysis Centers did not apply the sub-daily ERP model when transforming ICRF orbit solutions to ITRF, which is used for IGS orbit/clock products. This transformation inconsistency can cause significant orbit RMS differences that could exceed the 5-cm level. Independent ERP rate solutions are sensitive even to small errors in the sub-daily ERP model, and can be used to verify the sub-daily ERP model at, or below 0.1 mas/day precision level.The Precise Point Positioning (PPP) via precise station position solutions with the IGS orbit/clock combined products, provides an ideal interface to access the IGS realization of ITRF. PPP also yields precise station clock and tropospheric zenith delays (TZD) solutions, all at the sub-cm precision level. However, when using IGS orbit/clock products it is important that the same convention be used with respect to sub-daily ERP. Otherwise, the solutions of station navigation positions, station clocks and TZD's will be affected by significant errors that could exceed the 1-cm level.
Keywords:Earth rotation parameter  precise point positioning  global positioning system
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号