Delay time optimization in blasting operations for mitigating the vibration-effects on final pit walls' stability |
| |
Authors: | XZ Shi SHR Chen |
| |
Institution: | 1. School of Resources and Safety Engineering, Central South University, Changsha 410083, China;2. Postdoctoral Workstation of Daye Nonferrous Metals Company, Huangshi 435005, China |
| |
Abstract: | Blasting induced vibration is one of the fundamental problems in the open-pit mines and intense vibration can cause critical damage to structures and plants nearby the open-pit mines, especially to the final pit wall's stability. It is very important to study how to control vibration induced by blasting in the mitigation of negative effects of blasting in open-pit mines. This study aims to examine the propagation of blasting induced ground vibrations and find the feasible approaches to reduce the harmful effects of vibrations induced by blasting on the final pit wall's stability. For this purpose, a series of field experiments were conducted in XinQiao Mining Co. Ltd. Sixty-six events and the blasting parameters of these shots were carefully recorded. During the statistical analysis of the collected data, the predictor equation proposed by the United States Bureau of Mines (USBM) was used to establish a relationship between the Peak Particle Velocity (PPV) and the Scaled Distance (SD) factor. The relationship between PPV and SD was determined and proposed to be used in this open-pit mine. Control of maximum charge amount per delay and the selection optimum interval time to reduce the intensity of vibration by waveform interference were applied in practice. Based on the field experiments, we can determine the maximum charge amount per delay and 15 ms delay were proposed to be used in this site, and a decrease in vibration of 24.5% was obtained. |
| |
Keywords: | Open-pit mine Blasting induced vibrations Final pit wall's stability Waveform interference |
本文献已被 ScienceDirect 等数据库收录! |
|