首页 | 本学科首页   官方微博 | 高级检索  
     检索      

深水桥梁台阶式沉井基础局部冲刷特性研究
引用本文:闻云呈,王晓航,夏云峰,赵泽亚,成泽霖.深水桥梁台阶式沉井基础局部冲刷特性研究[J].海洋工程,2021,39(2):62-69.
作者姓名:闻云呈  王晓航  夏云峰  赵泽亚  成泽霖
作者单位:南京水利科学研究院,江苏南京 210029;南京水利科学研究院,江苏南京 210029;河海大学港口海岸与近海工程学院,江苏南京 210098
基金项目:国家重点研发计划项目(2018YFB16004);江苏水利科技项目(2020002,2020010)
摘    要:为探究台阶式沉井基础附近局部冲刷的影响,建立三维水动力数学模型,计算分析恒定流下台阶式沉井基础附近水动力特征。基于数值模拟结果设计了8个有效试验工况进行物理模型试验,分别探究了台阶式沉井平台宽度、埋置深度以及挡墙高度对局部冲刷特性的影响并进行讨论。试验结果表明台阶式沉井局部最大冲刷深度随平台截面宽度比增大逐步减小并趋于稳定。台阶式沉井局部最大冲刷深度随平台埋深比增大而逐步减小最终趋于稳定。台阶式沉井平台处设置较低挡墙对减小沉井周围局部冲刷最大深度有小幅的效果。

关 键 词:桥梁工程  台阶式沉井  局部冲刷形态  水槽试验
收稿时间:2020/12/31 0:00:00

Study on local scour characteristics of stepped open caisson of deep water foundations for bridge
WEN Yuncheng,WANG Xiaohang,XIA Yunfeng,ZHAO Zey,CHENG Zelin.Study on local scour characteristics of stepped open caisson of deep water foundations for bridge[J].Ocean Engineering,2021,39(2):62-69.
Authors:WEN Yuncheng  WANG Xiaohang  XIA Yunfeng  ZHAO Zey  CHENG Zelin
Institution:Nanjing Hydraulic Research Institute, Nanjing 210029, China; Nanjing Hydraulic Research Institute, Nanjing 210029, China;College of Harbour, Coastal and Offshore Engineering, Hohai University, Nanjing 210098, China
Abstract:To investigate the effect of local scour near the stepped open caisson, a 3D hydrodynamic numerical model has been established to simulate and analyze the hydrodynamic characteristics of stepped open caisson with flow. 8 effective cases were carried out by physical experiment basing on the results of numerical simulation. The effects of the width, embedded depth and underwater retaining wall height of stepped open caisson platform on local scour were studied and discussed. The experiment results show that the maximum local scour depth of stepped caisson gradually decreases and tends to be stable with the increase of the ratio of platform section width. The maximum local scour depth of stepped caisson decreases gradually with the increase of platform buried depth ratio, and finally tends to be stable. Setting lower underwater retaining wall of stepped caisson has a small effect on reducing the maximum depth of local scour around open caisson. The results will also provide scientific support for the follow-up design of open caisson.
Keywords:bridge engineering  stepped open caisson  local scour configuration  flume experiment
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《海洋工程》浏览原始摘要信息
点击此处可从《海洋工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号