首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三峡水库135m运行阶段永久船闸下引航道泥沙淤积分析
引用本文:胡兴娥,李云中,李明超.三峡水库135m运行阶段永久船闸下引航道泥沙淤积分析[J].水科学进展,2008,19(1):1-7.
作者姓名:胡兴娥  李云中  李明超
作者单位:1.天津大学建筑工程学院, 天津, 300072;
基金项目:国家重点基础研究发展计划(973计划) , 三峡工程攻关项目
摘    要:通过实测三峡水库135m运行阶段永久船闸下引航道及口门区泥沙淤积与水沙因子变化,计算分析了下引航道及口门区的淤积量及分布、拦门沙淤积形态、淤积机理及清淤时机,建立了口门含沙量与长江含沙量、口门斜流流速与长江流量、拦门沙淤积高度与来沙量等关系;并结合倒灌异重流理论,计算验证了下引航道及口门区异重流、环流淤积。结果表明,下引航道及口门区主要集中在主汛期(7~9月)淤积,汛末(10~12月)进行一次清淤即可满足航深要求。

关 键 词:泥沙淤积    异重流    永久船闸    下引航道    三峡水库
文章编号:1001-6791(2008)01-0001-07
收稿时间:2006-12-31
修稿时间:2006年12月31

Sediment deposition analysis of downstream access channel of permanent ship lock during 135m operational phase of Three Gorges reservoir
HU Xing-e,LI Yun-zhong,LI Ming-chao.Sediment deposition analysis of downstream access channel of permanent ship lock during 135m operational phase of Three Gorges reservoir[J].Advances in Water Science,2008,19(1):1-7.
Authors:HU Xing-e  LI Yun-zhong  LI Ming-chao
Institution:1.School of Civil Engineering, Tianjin University, Tianjin 300072, China;2.China Three Gorges Project Corporation, Yichang 443002, China;3.Hydrology and Water Resources Survey Bureau of Three Gorges, Yichang 443000, China
Abstract:Based on the abundant data of the sediment deposition and water-sediment factor change in the downstream access channel and entrance area of the permanent ship lock during 135m operational phase,a series of parameters and relationships are analyzed.These parameters include the deposition quantity and its distribution,the deposition configuration of entrance bar,the deposition mechanism and the rermval time of sediment.Then,some relational equations are established,such as sediment concentration between the entrance and the Yangtze River,inclined flow velocity of the entrance and discharge of the Yangtze River,the aggradation and the incoming sediment of entrance bar.And,the deposition of the density and circulation flow in the downstream access channel and entrance area are verified by the inverted density flow theory.The results indicate that the depositions in the downstream access channel and entrance area develop mainly in the major flood period (Jul.-Sept.),and one desalting in the later flood stage (Oct.-Dec.)can satisfy the shipping depth demand.
Keywords:sediment deposition  density flow  permanent ship lock  downstream access channel  Three Gorges reservoir
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《水科学进展》浏览原始摘要信息
点击此处可从《水科学进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号