首页 | 本学科首页   官方微博 | 高级检索  
     检索      

小浪底水库“腾库迎洪”期异重流形成分析
引用本文:夏润亮,李涛,余欣,夏军强,张俊华.小浪底水库“腾库迎洪”期异重流形成分析[J].水科学进展,1990,31(2):184-193.
作者姓名:夏润亮  李涛  余欣  夏军强  张俊华
作者单位:1. 黄河水利委员会黄河水利科学研究院, 河南郑州 450003;2. 武汉大学水资源与水电工程国家重点实验室, 湖北武汉 430072
基金项目:国家重点研发计划资助项目(2018YFC0407905);国家自然科学基金资助项目(51679103)
摘    要:小浪底水库异重流的形成与运行规律是关系黄河调水调沙方案拟定的重要指标。基于现场调研、理论探讨与预测分析结合等手段,明晰了2018年"腾库迎洪"期小浪底水库来水来沙过程,根据水库调度与库区淤积形态等边界条件,观测了异重流的形成与运行,采用基于流速分布的水库异重流潜入点预测公式进行了计算分析。结果表明:2018年7月库区产生的剧烈冲刷,在潜入点处发生大量淤积,水深大幅减小,引起潜入点下移;潜入点位置随入库水沙增大、坝前水位降低及库区淤积的推进向坝前移动,计算与实测结果反映了该变化过程。

关 键 词:异重流  潜入点水深  淤积形态  冲刷  小浪底水库  
收稿时间:2019-04-28

Analysis of the formation of density current in the period of discharging before flood in Xiaolangdi Reservoir
XIA Runliang,LI Tao,YU Xin,XIA Junqiang,ZHANG Junhua.Analysis of the formation of density current in the period of discharging before flood in Xiaolangdi Reservoir[J].Advances in Water Science,1990,31(2):184-193.
Authors:XIA Runliang  LI Tao  YU Xin  XIA Junqiang  ZHANG Junhua
Institution:1. Yellow River Institute of Hydraulic Research, YRCC, Zhengzhou 450003, China;2.State Key Laboratory of Water Resources and Hydropower Engineering, Wuhan University, Wuhan 430072, China
Abstract:The formation and creeping of the density current in the Xiaolangdi Reservoir are important indices of the water scheme and sediment regulation in the Yellow River. Previous studies have focused on the theory of density current in the Xiaolangdi Reservoir,real-time tracking on the operation process,and the analysis of surveyed data;however,they did not include related research on real-time prediction of the Xiaolangdi Reservoir and the tracking analysis of latest theoretical results. In this study,a field investigation,theoretical analysis,and prediction analysis were conducted to explain the process of water and sediment inflow from the Xiaolangdi Reservoir,during the period of discharging before the flood in 2018. The formation and creeping of the density flow were observed according to boundary conditions such as reservoir operation and reservoir siltation morphology. The plunging point formula of the density flow in the reservoir was predetermined,based on the velocity distribution. The results show that,in July 2018,intense scouring in the reservoir caused a significant amount of siltation to fall at the plunging area,thereby considerable decreasing the depth of clear water. This caused the plunging point to move downstream. The position of the plunging point moved ahead of the dam with the increase in water and sediment inputs,decrease of water level before the dam,and advance of the siltation in the reservoir. The calculated and measured results reflect on the changing process. These results can be used as a reference for the preparation and post-evaluation of reservoir water and a regulation plan for sediments. The results can also provide technical support for the operation as well as planning and design of reservoirs in sediment-laden rivers.
Keywords:density current  water depth of plunging point  sedimentation pattern  scouring  Xiaolangdi Reservoir  
点击此处可从《水科学进展》浏览原始摘要信息
点击此处可从《水科学进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号