首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Feasibility Analysis on Resuming Flow of Large Karst Spring in Heilongdong
Authors:BAI Xi-qing  LIU Yan
Institution:1.Hydrological Geology, Engineering Geology and Environmental Geology Exploration Institute, China National Administration of Coal Geology, Handan, Hebei, China, 056004;2.No.11 Geology Group, Hebei Provincial Bureau of Geology and Mineral Resources, China, 054000
Abstract:Based on discussion about the features of karst groundwater resources distribution of karst water system in Heilongdong Springs and causes of spring groups cutoff and according to current karst groundwater resources and exploitation distribution conditions of coal resources, this paper put forward the measures for protecting groundwater resources, i.e. intensifying plugging of underground coal mine gushing water points, grouting in advance to reinforce the small faults and weak lower confining bed of coal seam and leave sufficient waterproof coal pillars based on adjustment of the water sources for centralized water supply and water supplying and draining and countermeasures of improving use ratio of mine water and replacement of direct exploitation to realize resuming flow of spring groups and sustainable development of groundwater resources and exploitation of coal resources
Keywords:Karst water system  Resuming flow of spring groups  Water supplying and draining  Countermeasure
点击此处可从《》浏览原始摘要信息
点击此处可从《》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号