首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Economic aspects of pad construction costs on heap leach projects
Authors:D Van Zyl  M Henderson  B Cobb
Institution:(1) EIC Corporation, 1355 South Colorado Blvd., Suite 316, 80222 Denver, Colorado, USA;(2) Welsh Engineering, Inc., 5400 Equity Avenue, 89502 Reno, Nevada, USA;(3) CH2M Hill, 2020 SW Fourth Avenue, 2nd Floor, 97201 Portland, Oregon, USA
Abstract:Summary Pad construction costs can affect the overall economics of heap leach projects. Costs for single- and double-lined pads, using various designs, are listed for a typical small and large project. Double-lined pads are now frequently required by regulatory agencies. Unless such designs significantly reduce the risk of site-specific contamination, the extra costs cannot be justified from an economical viewpoint. Specific attention is given to the short project life (typically five years) of heap leach projects. A few numerical examples are presented to demonstrate the overall impact of these costs on economic parameters.
Keywords:Heap leaching  pad construction  economics
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号