首页 | 本学科首页   官方微博 | 高级检索  
     检索      

杨柳垭滑坡应急处置工程实践
引用本文:肖进.杨柳垭滑坡应急处置工程实践[J].地质灾害与环境保护,2011,22(2):65-70.
作者姓名:肖进
作者单位:四川建筑职业技术学院,德阳,618000
摘    要:以杨柳垭滑坡应急处置为例,研究控制推移式滑坡体变形成灾的途径。从变形特征、工程地质、处置过程和工程措施4个方面分析其应急措施。现场监测和数值模拟对各项工程的效果检验表明,推移式滑坡抢险可通过后缘减载、前缘堆载、抗滑桩和地表截排水,进行治理。

关 键 词:杨柳垭  推移式滑坡  应急处置  数值模拟

ENGINEERING PRACTICE IN THE EMERGENCY TREATMENT OF YANGLIUYA LANDSLIDE
Xiao Jin.ENGINEERING PRACTICE IN THE EMERGENCY TREATMENT OF YANGLIUYA LANDSLIDE[J].Journal of Geological Hazards and Environment Preservation,2011,22(2):65-70.
Authors:Xiao Jin
Institution:Xiao Jin(Sichuan College Of Architectural Technology,Deyang,Sichuan 618000,China)
Abstract:The emergency treatment is discussed to illustrate the approach to control the devastation of pushing slopes.It is analyzed in terms of deformation features,engineering geology,engineering measures and disposal process.Field measuring,monitoring and numerical simulation were used to test the effects of the various engineering projects,and the results showed that pushing slopes can be disposed of through back-load reducing,front heap loading,anti-slide piling,surface-water blocking and draining.
Keywords:Yangliuya  pushing slopes  emergency treatment  numerical simulation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号