引用本文:陈元智.福建大唐宁德电厂海堤施工期岩土监测实例分析[J].福建地质,2007,26(3):172-178.
作者姓名:陈元智
作者单位:福建省闽东工程勘察院,宁德,352100
摘    要:在沿海滩涂地带进行大型海堤建设,项目难度大,施工风险较高。为了使项目工程建设安全可靠地进行,必须开展施工期现场岩土监测工作。综合介绍省重点建设项目——福建大唐宁德电厂的海堤施工现场采用多种岩土监测手段,总结和分析各种监测成果,为工程建设提供可靠的科学依据。确保海堤施工顺利进展。

关 键 词:软土  海堤施工  现场监测  福建宁德
收稿时间:2007-07-15

Case Analysis of Rock and Soil Monitoring in the Seawall Construction of Datang Ningde Thermal Power Plant
Chen Yuanzhi.Case Analysis of Rock and Soil Monitoring in the Seawall Construction of Datang Ningde Thermal Power Plant[J].Geology of Fujian,2007,26(3):172-178.
Authors:Chen Yuanzhi
Institution:Southeastern Fujian Institute of Engineering Exploration,Ningde,352100
Abstract:There are a great item difficulty and higher ventures in the large size of seawall construction along the shallows-tidal-flat area of the sea coast.On the safe side of the engineering construction,it must be able to carry out the rock and soil monitoring in situ during the construction period.The paper reports the multi-monitoring means taken on the spot in the seawall construction of the Datang Ningde Thermal Power Plant,which is a key construction project of Fujian Province,and some monitoring results.The monitoring results make an offer of reliable and scientific references for the engineering construction,consequently,and ensure the construction of the sea wall.
Keywords:mollisol  sea wall  construction site  monitoring  Ningde City  Fujian Province