首页 | 本学科首页   官方微博 | 高级检索  
     检索      

石期河流域岩溶水系统及其水资源构成分析
引用本文:劳文科,蓝芙宁,蒋忠诚,覃小群,谢运球,邓 艳.石期河流域岩溶水系统及其水资源构成分析[J].中国岩溶,2009,28(3):255-262.
作者姓名:劳文科  蓝芙宁  蒋忠诚  覃小群  谢运球  邓 艳
作者单位:中国地质科学院岩溶地质研究所,广西,桂林,541004
基金项目:国家"十一五"科技支撑计划课题,中国地质调查局地质调查项目,中国地质科学院基本科研业务费专项经费,岩溶地质研究所所控项目 
摘    要:在深入研究石期河流域岩溶水系统含水介质结构特征、水资源形成的基础上,通过对流域岩溶水总排泄口流量动态长观资料系列的分析,选择2005年丰水期内最后一次洪峰(年内最大洪峰)后的流量衰减过程,根据该过程的数据资料建立本流域岩溶水总排泄口的流量衰减方程,并利用该流量衰减方程对流域岩溶水资源的构成进行定量分析研究。结果表明,石期河流域岩溶水系统在2005年最大洪峰状态下,可自然排泄的岩溶水资源总量为69469.95×10^4m^3,其中:流域坡面产流占3.64%,赋存干大型溶洞或管道中的溶洞-管道水占4.53%,赋存于小型管道或强岩溶化裂隙中的管道一裂隙水占74.10%,赋存于细小溶蚀裂隙中的溶隙水占17.73%。从衰减期的初始时刻起,它们各自可供消耗(可作为有效利用岩溶水资源)的时效分别为2日、8日、35日和126日以上。

关 键 词:岩溶水系统  水资源构成  石期河流域
收稿时间:6/4/2009 12:00:00 AM

Analysis on karst groundwater system and its water resources composition in Shiqihe basin
Lao Wen-ke,Lan Fu-ning,Jiang Zhong-cheng,Qin Xiao-qun,Xie Yuan-qiu and Deng Yan.Analysis on karst groundwater system and its water resources composition in Shiqihe basin[J].Carsologica Sinica,2009,28(3):255-262.
Authors:Lao Wen-ke  Lan Fu-ning  Jiang Zhong-cheng  Qin Xiao-qun  Xie Yuan-qiu and Deng Yan
Institution:Institute of Karst Geology, CAGS;Institute of Karst Geology, CAGS;Institute of Karst Geology, CAGS;Institute of Karst Geology, CAGS;Institute of Karst Geology, CAGS;Institute of Karst Geology, CAGS
Abstract:Based on the further study on the aquifer structure characteristics and water resources formation of the karst groundwater system in Shiqihe basin, the flow attenuation process after the last flood peak in 2005(the biggest flood in the year) was taken as the data source to establish a total discharge-flow attenuation equation through the series analysis on the long-term observation data of the dynamic flow at the total discharge site. And then, the water resources composition was studied and analysis by means of the attenuation equation in the paper. The results show that total natural karst water discharge of the Shiqi river is 69 469.95×104 m3during the largest flood peak in 2005, which is composed of 4 parts: Slope runoff accounts for 3.64%, large scale karst conduit flow accounts for 4.53%, small karst conduit flow or strong developed karst fissure flow accounts for 74.10%, and small karst fissure flow accounts for 17.73 %. From the initial attenuation (can be regarded as the effective karst water resources), those flow can last for 2, 8 and 35 as well as more than 126 days respectively.
Keywords:karst groundwater system  water resources composition  Shiqihe basin
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《中国岩溶》浏览原始摘要信息
点击此处可从《中国岩溶》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号