首页 | 本学科首页   官方微博 | 高级检索  
     检索      

我国某地下油库预可行性研究地应力测量及其应用分析
引用本文:侯砚和,孙炜锋,陈群策,王宝君,陈少楠.我国某地下油库预可行性研究地应力测量及其应用分析[J].地质力学学报,2006,12(2):197-202.
作者姓名:侯砚和  孙炜锋  陈群策  王宝君  陈少楠
作者单位:1. 中国地震局地壳应力研究所,北京,100085
2. 中国地质科学院地质力学研究所,北京,100081
3. 黑龙江煤田地质108勘探队,黑龙江,鸡西,158100
摘    要:本文运用水压致裂地应力测量方法,对我国某地下油库预可行性研究工程场区两个钻孔进行了地应力测量。测量结果表明:最大和最小水平主应力(SH,Sh)都远大干对应深度处的垂向应力(Sv),三向主应力的关系为:SH〉Sh〉Sv,应力大小在该深度范围属中等偏大级别;工程场区最大水平主应力方向近EW方向,与测点外围确定的区域最大水平主应力总体方向较为一致;建议未来地下硐库长轴按近EW分布,地应力状态、岩体结构构造、岩石强度等基本保证了其岩体稳定性。

关 键 词:地下油库  水压致裂地应力测量  地应力状态
文章编号:1006-6616(2006)02-0197-06
收稿时间:2006-03-28
修稿时间:2006年3月28日

IN SITU STRESS MEASUREMENT AND ITS APPLICATION IN THE PRE-FEASIBILITY STUDY OF AN UNDERGROUND OIL RESERVOIR IN CHINA
HOU Yan-he,SUN Wei-feng,CHEN Qun-ce,WANG Bao-jun,CHEN Shao-nan.IN SITU STRESS MEASUREMENT AND ITS APPLICATION IN THE PRE-FEASIBILITY STUDY OF AN UNDERGROUND OIL RESERVOIR IN CHINA[J].Journal of Geomechanics,2006,12(2):197-202.
Authors:HOU Yan-he  SUN Wei-feng  CHEN Qun-ce  WANG Bao-jun  CHEN Shao-nan
Institution:Geostress Institute of State Seismic Bureau, Beijing 100085, China,Institute of Geornechanics, Chinese Academy of Geological Sciences, Beijing 100081 China,Geostress Institute of State Seismic Bureau, Beijing 100085, China,No. 108 Geological Party of Heilongjiang Coal Exploration, Jixi 158100, Heilongjiang, China and No. 108 Geological Party of Heilongjiang Coal Exploration, Jixi 158100, Heilongjiang, China
Abstract:Hydrofracturing in situ stress measurements were used to determine in situ stress states of two drill holes for the pre-feasibility study of an underground reservoir at an engineering site in China.Both the maximum and minimum horizontal principal stresses(S_H and S_h)are by far greater than the vertical stress(S_v)at the same depth,and the SH and Sh are higher than the normal stress state at the depth range,with a relation of S_H>S_h>S_v.The maximum horizontal principal stress direction is nearly(E-W),which is in accord with the general direction of the regional maximum horizontal principal stress determined by measuring points in surrounding areas.The authors suggest that the long axis of the underground reservoir should be oriented in a nearly E-W direction in the future,and the in situ stress state,rock mass structure and rock strength will in the main ensure the rock mass stability.
Keywords:underground oil reservoir  hydrofraeturing in situ stress measuring  in situ stress state
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《地质力学学报》浏览原始摘要信息
点击此处可从《地质力学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号