首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于灰色关联度法的可拓理论在霍尔古吐水电站坝址区泥石流危险性评价中的应用
引用本文:吕擎峰,李军鹏,赵本山,何晓东.基于灰色关联度法的可拓理论在霍尔古吐水电站坝址区泥石流危险性评价中的应用[J].工程地质学报(英文版),2016,24(2):211-219.
作者姓名:吕擎峰  李军鹏  赵本山  何晓东
作者单位:1.兰州大学 西部灾害与环境力学教育部重点实验室 兰州 730000;
基金项目:国家自然科学基金项目(51469001)资助
摘    要:泥石流危险性评价是灾情预测、防灾救灾决策中的重要内容,是国内外灾害科学研究的热点之一。本文以新疆开都河霍尔古吐水电站坝址区群沟泥石流为研究对象,在对泥石流区域地质环境研究的基础上,选取泥石流规模、爆发频率等8个因素作为评价因子,采用灰色关联度确定评价因子权重,运用可拓理论,通过定性和类比的方法对群发泥石流区域进行危险性评价。将评价结果与刘希林提出的单沟泥石流评价结果比较,清水沟与雪莲沟的可拓法评价危险度等级要高于单沟泥石流评价结果,这一结果和现场调查情况相吻合。因此,基于灰色关联度法的可拓理论对霍尔古吐水电站坝址区群发泥石流危险度评价结果合理可靠,进而为坝区泥石流危险性评估、规划防治提供合理的科学依据。

关 键 词:泥石流    危险性评价    灰色关联度    可拓学    霍尔古吐水电站
收稿时间:2014-11-01

DEBRIS FLOW RISK ASSESSMENT AT HUOERGUTU HYDROPOWER DAM SITE USING GREY CORRELATION METHOD AND EXTENSION THEORY
Institution:1.Key Laboratory of Mechanics on Western Disaster and Environment Mechanics, Lanzhou University, Lanzhou 730000;2.Northwest Investigation Design and Research Institute, China Hydropower Engineering Consulting Group Corporation, Xi'an 710065
Abstract:Hazard assessment of debris flow is a hot research topic of the disaster science. It is an important task of disaster forecast, prevention and reduction. This paper takes the debris flow gullies atthe dam site in Huoergutu hydropower along Xinjiang Kaidu River as the research area. Based on the studying of the geological environment, it selects eight aspects as evaluation factors. They include debris flow scale, outbreak of the frequency. The weight coefficient of contestant factors is obtained using thegray correlation degree. The risk assessment of debris flow gulliesis evaluated through the qualitative and analogical methods. The results are compared with the results of site-specific debris flowharazd assessment by LIU Xilin. The risk degrees of the Qingshui gully and Xuelian gully using the extension theory are greater than the results of site-specific debris flow harazd assessment, which iscoincided with the filed investigation. Therefore, the grey correlation and extension theory based method for debris flow gullies at the dam site is reasonable and reliable. The method provides reasonable and scientific basis for risk assessment, planning and controlling of debris flows at the dam site.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《工程地质学报(英文版)》浏览原始摘要信息
点击此处可从《工程地质学报(英文版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号