首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Controlled blasting in a limestone mine using electronic detonators: A case study
Authors:Arvind K Mishra  Y K Nigam  Deepanshu R Singh
Institution:1.Department of Mining Engineering,Indian Institute of Technology (ISM),Dhanbad,India;2.Sandvik Asia Pvt. Ltd.,Pune,India
Abstract:Except for very deep-seated deposits, open cast mining method has been recognized as the safest and most productive mode for mining minerals. Ever growing demand in minerals and coal has compelled the mine operators to increase the size of mine, which has resulted in an increasing trend towards large capacity open cast projects. Explosives and blasting techniques play a significant role in efficient opencast mining operations. There have been constant technological developments towards safer, faster, economical and more efficient blasting systems. Further, globally increased competitiveness has necessitated to carryout blasts in such a way that the desired degree of fragmentation is achieved in the primary blast, with minimum undesired side effects such as ground vibration, air blast/noise, flyrock, generation of oversize boulders, formation of toe, and over break or back break. Hence, the ultimate objective of the blasting engineer is to ensure that the blasts are carried out in an eco-friendly manner. This paper presents a case study of limestone mine where a controlled blasting was conducted near a green structure of wagon tippler (at 2 m) being constructed for foundation work of belt conveyor as the mine management wants to double the existing production. This paper deals with controlled blast design and its implementation using electronic detonators with signature hole technique.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号