首页 | 本学科首页   官方微博 | 高级检索  
     检索      

金沙江白格滑坡残留体稳定性分析与防治对策
引用本文:朱德明,李鹏岳,胡孝洪,吴新明.金沙江白格滑坡残留体稳定性分析与防治对策[J].现代地质,2021,35(1):56-63.
作者姓名:朱德明  李鹏岳  胡孝洪  吴新明
作者单位:1. 西藏自治区地质矿产勘查开发局 第二地质大队,西藏 拉萨 8500002. 中国地质调查局 成都地质调查中心,四川 成都 6100813. 地矿眉山工程勘察院,四川 眉山 620000
摘    要:金沙江白格滑坡在经历了2018年10月和11月的2次滑动堵江后,在其后缘仍存在K1、K2和K3等3处规模较大的残留崩滑体,并有再次失稳堵江的可能。目前关于残留体稳定性的研究还存在较大争议,多从影响因素及成因机制等方面进行定性分析,其结果依赖于评价者的经验,差异较大。在野外调查的基础上,针对白格滑坡所在区工程地质条件及其残留体变形特征,选取坡高、坡度、坡面形态、临空面、地下水出露、裂缝发育和变形等7个因素作为评价因子,基于模糊综合评判模型,运用层次分析法对白格滑坡残留体进行分区稳定性评价,并提出相应的防治对策。评价结果表明:K1与K2残留体稳定性较差;K3残留体基本稳定,与实际调查状况较吻合。研究结果可为同类型滑坡的评价与防治提供参考。

关 键 词:滑坡残留体  稳定性  模糊综合评价  防治建议  白格滑坡  
收稿时间:2020-07-20
修稿时间:2020-12-09

Stability Analysis and Prevention Countermeasures for Residual Bodies of Baige Landslide in Jinsha River
ZHU Deming,LI Pengyue,HU Xiaohong,WU Xinming.Stability Analysis and Prevention Countermeasures for Residual Bodies of Baige Landslide in Jinsha River[J].Geoscience——Journal of Graduate School,China University of Geosciences,2021,35(1):56-63.
Authors:ZHU Deming  LI Pengyue  HU Xiaohong  WU Xinming
Institution:1. No.2 Geological Party,Bureau of Geology and Mineral Exploration and Development, Lhasa,Tibet 850000,China2. Chengdu Center, China Geological Survey,Chengdu,Sichuan 610081,China3. Geological and Mineral Meishan Engineering Survey Institute,Meishan, Sichuan 620000,China
Abstract:After the Baige landslide in Jinsha River experienced two times of sliding and blocking the river,the main body material of the landslide was greatly reduced,but there were still three large residual bodies in its trailing edge,i.e.,K1,K2 and K3.Whether it has the possibility of again losing stability and blocking the river has become the focus of current work.The stability evaluation of landslide residues is mainly based on the factors of influence and the mechanism for the qualitative analysis,the results is more artificial due to the experience of the valuator.On the basis of field investigation,according to the engineering geological conditions and deformation characteristics of the area where the Baige landslide is located,seven factors such as slope height,slope angle,slope shape,free surface condition,groundwater seepage,fracture development and deformation were selected as evaluation factors,and based on AHP the fuzzy comprehensive evaluation model is used to evaluate the stability of the partition of Baige landslide.The evaluation results show that the stability of K1 and K2 residues is poor,and that of K3 residues is basically stable,which is in line with the actual survey status.The corresponding prevention and control countermeasures are put forward.The results can provide a valuable support for the evaluation and prevention of the same type of landslide.
Keywords:landslide residue  stability  fuzzy comprehensive evaluation  prevention suggestion  Baige landslide
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《现代地质》浏览原始摘要信息
点击此处可从《现代地质》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号