定福庄地热试验井成井工艺研究
引用本文:左明星,王佟,曾铁军.定福庄地热试验井成井工艺研究[J].中国煤田地质,2006,18(6):52-54.
作者姓名:左明星  王佟  曾铁军
作者单位:河南理工大学资源环境学院,中国煤炭地质总局第一勘探局,中国煤炭地质总局129勘探队 河南焦作454000,中国煤炭地质总局129勘探队,河北邯郸056004,河北邯郸056004,河北邯郸056004
摘    要:JR-121井位于北京市定福庄南里,开采蓟县系雾迷山组1600m以深热储层的岩溶裂隙水。该试验井施工使用GZ-2000型水源钻机,TBW-850/50型泥浆泵,钻探深度2202.98m。成井过程中,根据不同层段,采用不同成井工艺,在目的含水层的上覆非取水层段,采用分级下套管及水泥封闭的方法进行止水,泥浆与回旋方法钻进;在取水段,采用裸眼孔底钻铤加压、泥浆护壁与回旋钻进。洗井工艺上,采用酸化、液态CO2和空压机引喷相结合的联合洗井方法。使用此成井工艺,止水效果良好,达到了开发岩溶裂隙地热水的目的。

关 键 词:岩溶裂隙水  蓟县系雾迷山组  止水层位  成井工艺  地热试验井  钻井
文章编号:1004-9177(2006)06-0052-03
修稿时间:2006年5月29日

A Study on Well Completion Technology of a Geothermal Test Well in Dinfuzhuang,Beijing
Zuo Mingxing,Wang Tong and Zeng Tiejun.A Study on Well Completion Technology of a Geothermal Test Well in Dinfuzhuang,Beijing[J].Coal Geology of China,2006,18(6):52-54.
Authors:Zuo Mingxing    Wang Tong and Zeng Tiejun
Institution:Zuo Mingxing1,3,Wang Tong2 and Zeng Tiejun3
Abstract:The No.JR-121 well is located in Dingfuzhuang Nanli,Beijing.It mines karstic fissure water from a geothermal water reservoir under the depth of 1600m in Wumishan Formation,Jixian System.The GZ-2000 type water source drill rig and TBW-850/50 mud pump were used in the test well construction,drilling depth 2202.98m.The well completion technologies including: stepping casing in,cementing sealing up,mudding and rotary drilling were used in aquifer overlying non water drafting sector;open-hole bottom drill collar pressure drilling,mudding and rotary drilling were used in water drafting sector.Well cleanup technology of combined acidifying,liquid CO2 and air compressor blowout inducing method was used.The well completion technology has good water sealing result and helpful in the karstic fissure geothermal water exploitation.
Keywords:karstic fissure water  Wumishan Formation  Jixian System  water sealing horizon  well completion technology  geothermal test well  well drilling