摘    要:对1998年长江中游特大洪灾分析表明:长江中上游植被破坏,中游湖泊萎缩,干堤防洪标准低,河道泄洪不畅,是洪灾形成的主要因素.三峡水库是长江中游防洪体系中的骨干工程,必须与其他工程相配合.长江中游防洪减灾工程应坚持:(1)与环境保护相结合的原则;(2)与农田水利基本建设相结合的原则;(3)"固、蓄、疏"并举,以"疏"为主的原则;(4)防洪与除渍相结合的原则;(5)统一管理、联合攻关、综合整治的原则与对策.建议除加固长江干堤外,重点建设两条分洪河道,建好3个梯级蓄洪区,有计划有步骤地实施开堤开垸放淤工程.

关 键 词:防洪对策  环境治理  分洪河道  长江中游

PROBLEMS AND STRATEGIES FOR FLOOD CONTROL OF MIDDLE REACHES OF YANGTZE RIVER: REFLECTION ON CATASTROPHIC FLOOD OF YANGTZE RIVER IN 1998
Li Chang''''an,Yin Hongfu,Chen Dexing,Wang Bo.PROBLEMS AND STRATEGIES FOR FLOOD CONTROL OF MIDDLE REACHES OF YANGTZE RIVER: REFLECTION ON CATASTROPHIC FLOOD OF YANGTZE RIVER IN 1998[J].Earth Science-Journal of China University of Geosciences,1999,24(4):329-334.
Authors:Li Chang'an  Yin Hongfu  Chen Dexing  Wang Bo
Abstract:The catastrophic flood of the Yangtze River in 1998 resulted mainly from the destruction of the vegetation in the middle and upper reaches of the Yangtze River, from the shrinkage of the lakes in the middle reaches of the Yangtze River, from the low flood-control capacity standard for the building of the main dikes, and from the smaller flood discharge rate of the main channel. The Three Gorges reservoir project, a backbone project in the flood-control system in the middle reaches of the Yangtze River, must match other water conservancy projects in the same reaches. The following five principles should be adopted for the flood-control and hazard-reduction water conservancy projects in the middle reaches of the Yangtze River (1) The building projects for the flood control and hazard reduction should be combined with the environmental protection. (2) The building projects should be combined with the capital construction on farms and water conservancy. (3) The building projects should center around the discharge of the flood, with the contemporaneous implementation of the dike consolidation, flood storage, and flood discharge. (4) The flood control should be combined with the flood discharge. (5) A unified administration should be created for the management of the joint key projects and for the comprehensive reconstruction. It is suggested in this paper that the main dikes of the Yangtze River should be consolidated, two river channels for the flood discharge should be built, three step-like flood storage zones should be constructed, and the flood discharge projects should be carried out through opening dikes and cofferdams to drain away the silt of channel into the polder as planned.
Keywords:flood_control strategy  environmental protection  flood_discharge river channel  middle reaches of Yangtze River  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号