首页 | 本学科首页   官方微博 | 高级检索  
     检索      

桩-土荷载传递机理的试验研究
引用本文:李晓明,殷建武,施俊生,郭俊才.桩-土荷载传递机理的试验研究[J].华东地质学院学报,2006,29(3):249-252.
作者姓名:李晓明  殷建武  施俊生  郭俊才
作者单位:河南省信阳市建设工程质量检测站 河南信阳464000(李晓明),河南省核工业地质局 河南信阳464000(殷建武,施俊生),省信阳市工程地质勘察院 河南信阳4640000(郭俊才)
摘    要:静载荷试验是一项方法可行,理论上无可争议的桩基检测技术。在确定单桩极限承载力方面,它是目前最为准确,可靠的检验方法。为了进一步分析桩的荷载传递和承载力性状,预先在试验桩主筋上布置钢筋应力计以测量桩身轴向应力,在桩底埋设压力盒以测量桩端阻力。通过对实测数据的计算,便可得到试桩在各级荷载作用下的侧摩阻力和端阻力分布图,从而了解该桩的荷载传递和承载力性状。结合工程实践,通过对一工程三组测试桩静载荷实验及应力测试结果的分析,说明了桩-土的荷载传递机理。

关 键 词:桩-土荷载  静载荷试验  传递机理
文章编号:1000-2251(2006)03-249-04
收稿时间:2006-03-20
修稿时间:2006年3月20日

Test Research of Transfer Mechanism on the Pile-earth Loading
LI Xiao-ming,YIN Jian-wu,SHI Jing-sheng,GUO Jun-cai.Test Research of Transfer Mechanism on the Pile-earth Loading[J].Journal of East China Geological Institute,2006,29(3):249-252.
Authors:LI Xiao-ming  YIN Jian-wu  SHI Jing-sheng  GUO Jun-cai
Institution:1. Xingyang Construction Project Quality Detecting Station in Henan Province, Xingyang, HN 464000, China; 2. Geology Bureau of Nuclear Industry in Henan Province, Xingyang, HN 464000, China; 3. Xingyang Institute of Engineering Geological Survey in Henan Province, Xingyang, HN 464000, China ;
Abstract:Static loading test was a testing techniques on pile foundations with feasible method and beyond controvercy theory.In term of determine ultimate bearing capacity,this is a best accurate and dependable test method.at present.For in-depth analysis of loading transfer and bearing capacity property on pile body,preliminarily we had arranged rebar stress gauge on trial pole main reinforcement to measure pile body axial stress and inbuilted stress box under the pile to survey tip resistance.By calculating actual measured data,the trial pile side friction resistance and end resistance distribution map had been gained at all levels loading action.Thus loading transfer and bearing capacity property on pile can be known.In this paper,combining three trial pile static loading with analysis of stress results,transfer mechanism on the pile-earth loading had been illustrated.
Keywords:the pile-earth loading  static loading test  transfer mechanism
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号