首页 | 本学科首页   官方微博 | 高级检索  
     检索      

采空场覆岩变形数值模拟与相似模拟比较研究
引用本文:李向阳,李俊平,周创兵,向文飞.采空场覆岩变形数值模拟与相似模拟比较研究[J].岩土力学,2005,26(12):1907-1912.
作者姓名:李向阳  李俊平  周创兵  向文飞
作者单位:1. 武汉大学,水资源与水电工程科学国家重点实验室,武汉,430072
2. 武汉大学,水资源与水电工程科学国家重点实验室,武汉,430072;鸡西大学,黑龙江,鸡西,158100
摘    要:用有限元数值计算尝试了离层模拟,并分别采用数值模拟与相似模拟的方法研究了木架山矿区143剖面倾斜采空场处理时的地表移动与覆岩破坏规律。研究发现,随着矿柱的崩落,覆岩跨度不断增加,引起的地表移动范围也不断增大,地表垂直沉降范围大致为跨度的1.5~1.7倍,垂直沉降曲线始终对称于最大沉降点;水平移动的范围大于垂直沉降的范围,最大水平移动量大约为最大沉降量的40%,且水平移动不对称。另外,当覆岩发生整体下沉时离层主要存在于跨度两端,离层由层理剪切破坏引起。

关 键 词:数值模拟  相似模拟  地表移动  覆岩离层
文章编号:1000-7598-(2005)12-1907-06
收稿时间:2004-05-28
修稿时间:2004-08-18

Comparative study on numerical simulation and similarity simulation of overburden deformation in abandoned stope
LI Xiang-yang,LI Jun-ping,ZHOU Chuang-bing,Xiang wen-fei.Comparative study on numerical simulation and similarity simulation of overburden deformation in abandoned stope[J].Rock and Soil Mechanics,2005,26(12):1907-1912.
Authors:LI Xiang-yang  LI Jun-ping  ZHOU Chuang-bing  Xiang wen-fei
Institution:1. State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China; 2. Jixi University, Jixi, 158100, China
Abstract:An attempt is made to simulate the layer separation in overburden by using the finite element numerical modeling;and the numerical modeling together with similarity simulation is adopted to investigate the surface movement and the breakage of the overburden during the abandoned stope treatment of the section #143 in Mujia Hill.It has been found from this research that the range of surface movement increases moderately with the collapse of jambs and the increase of the roof span.The subsidence area ranges from 1.5 times to 1.7 times of the roof span and the subsidence curves are symmetrical to the vertical line through the point with maximum subsidence.The horizontal movement,however,is not symmetrical and its impacting area is larger than the range of subsidence,with its maximum value equal to 40 % of the maximum subsidence.In addition,the layer separation exists in the end of span of overburden if the subsidence happens in whole overburden,which is resulted from the shear failure of the bedding plane.
Keywords:numerical simulation  similarity-simulation  upper movement  layer separation in overburden
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号