湛江湾高水头跨海盾构隧道管片结构典型断面受力计算与监测反馈分析
引用本文:姜燕,杨光华,陈富强,徐传堡,张玉成.湛江湾高水头跨海盾构隧道管片结构典型断面受力计算与监测反馈分析[J].岩土力学,2018,39(1):275-286.
作者姓名:姜燕  杨光华  陈富强  徐传堡  张玉成
作者单位:1. 广东省水利水电科学研究院,广东 广州 510610;2. 广东省岩土工程技术研究中心,广东 广州 510640; 3. 华南理工大学 土木与交通学院,广东 广州 510641
基金项目:广东省省级科技计划项目(No. 2014B070706008);国家自然科学基金(No. 51378131)。
摘    要:湛江湾隧道是目前国内最深的跨海盾构隧道,其管片采用斜螺栓连接,错缝拼装,分别采用修正惯用法及梁-弹簧法计算最大覆土断面与最大水深断面管片的受力,并将实测管片受力、水-土压力值与理论计算结果进行比较,分析水-土压力分布模式,结果表明,修正惯用法与梁-弹簧法均可以较好地模拟隧道管片的受力形态,而梁-弹簧法比修正惯用法更接近实测结果;管片呈压扁状态,梁-弹簧法结果受封顶块的位置影响较大;太沙基松弛土压力及水-土压力线性分布模式对深埋海底隧道是适用和安全的;对于本工程来说,管片外荷载以径向水压力为主,是影响管片轴力的主要因素。以上成果可为今后跨海高水头盾构隧道管片的设计及施工提供参考。

关 键 词:梁-弹簧法  修正惯用法  跨海盾构隧道  管片受力分析  监测反馈分析  
收稿时间:2016-01-14

Force determination and monitoring feedback analysis of typical sections of lining structure of cross-sea shield tunnel under high head in Zhanjiang bay
JIANG Yan,YANG Guang-hua,CHEN Fu-qiang,XU Chuan-bao,ZHANG Yu-cheng.Force determination and monitoring feedback analysis of typical sections of lining structure of cross-sea shield tunnel under high head in Zhanjiang bay[J].Rock and Soil Mechanics,2018,39(1):275-286.
Authors:JIANG Yan  YANG Guang-hua  CHEN Fu-qiang  XU Chuan-bao  ZHANG Yu-cheng
Institution:1. Guangdong Research Institute of Water Resources and Hydropower, Guangzhou, Guangdong 510610, China; 2. Geotechnical Engineering Technology Center of Guangdong Province, Guangzhou, Guangdong 510640, China; 3. School of Civil Engineering and Transportation, South China University of Technology, Guangzhou, Guangdong 510641, China
Abstract:Currently, Zhanjiang bay tunnel is the deepest cross-sea shield tunnel in China. The tunnel segments are connected by oblique bolts with staggered arrangements. In this study, the forces in the maximum covering soil section and the maximum water depth section were calculated by a modified usage method and a beam-spring method, respectively. Then the distribution pattern of water-earth pressure was analyzed by comparing theoretical results with measured results of segment stress and water-earth pressure. The analytical results show that both of the modified usage method and the beam-spring method can well simulate the stress state of tunnel segment. Especially, the results calculated by beam-spring method is relatively closer to measured results than those by the modified usage method. It is found that segments are in flattening states and the results obtained by beam-spring method are greatly affected by the position of capping blocks. Terzaghi’s relaxed earth pressure and the linear distribution of water-earth pressure are also applicable and safe for the deeply buried submarine tunnel. In this project, the lateral load of the segment is dominated by radial water pressure, which mainly affected the axial force. Therefore, this study can provide a useful reference for the design and construction of high-head cross-sea shield tunnel segments in the future.
Keywords:beam-spring method  modified usage method  cross-sea shield tunnel  force analysis of segments  monitoring feedback  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文