首页 | 本学科首页   官方微博 | 高级检索  
     检索      

复杂层状岩层隧道塌方原因分析与加固后信息化施工技术
引用本文:陈秋南,赵明华,周国华,黄胜平,周应麟.复杂层状岩层隧道塌方原因分析与加固后信息化施工技术[J].岩土力学,2009,30(3):650-653.
作者姓名:陈秋南  赵明华  周国华  黄胜平  周应麟
作者单位:1. 湖南大学,土木工程学院,长沙,410082;湖南科技大学,土木工程学院,湘潭,411201
2. 湖南大学,土木工程学院,长沙,410082
3. 湖南科技大学,土木工程学院,湘潭,411201
4. 湖南路桥建设集团公司,长沙,410012
基金项目:国家高技术研究发展计划(863计划),湖南省自然科学基金,湖南省高校科学研究项目,中国博士后科学基金,国家安全生产监督管理总局资助项目,湖南省高等学校青年骨干教师培养计划 
摘    要:关口垭隧道右洞Yk73+955~Yk73+925段在施工过程中出现塌方,从层状岩层分布、偏压和雨水侵蚀作用以及前期地质勘测欠准确等方面分析塌方原因,结合工程具体情况,比较分析超前小导管和长大管棚处理方案的优缺点,选择超前小导管预注浆辅以工字钢处理塌方区,在处理段增设监测断面,通过监测隧道的收敛位移和拱顶下沉量以及钢拱架的内力反映隧道围岩的稳定状况,量测结果表明,在一定时间内围岩达到稳定,表明采用超前小导管预注浆方法处理隧道塌方区效果良好。

关 键 词:隧道工程  复杂层状岩层  塌方  超前小导管注浆  信息化施工  监控量测
收稿时间:2008-03-21

Cause analysis of complex layered rock tunnel collapse and information construction technology after consolidation
CHEN Qiu-nan,ZHAO Ming-hua,ZHOU Guo-hua,HUANG Sheng-ping,ZHOU Ying-lin.Cause analysis of complex layered rock tunnel collapse and information construction technology after consolidation[J].Rock and Soil Mechanics,2009,30(3):650-653.
Authors:CHEN Qiu-nan  ZHAO Ming-hua  ZHOU Guo-hua  HUANG Sheng-ping  ZHOU Ying-lin
Institution:1. College of Civil Engineering, Hunan University, Changsha 410082, China; 2. School of Civil Engineering , Hunan University of Science & Technology, Xiangtan 411201, China; 3. Hunan Road & Bridge Construction Group Corp., Changsha 410012, China
Abstract:During Guankouya Tunnel construction, collapse of the section YK73+955-YK73+925 of right tunnel arose. Distribution of layered rock, unsymmetrical pressure, continuous rainstorm and cracked surrounding rock, inaccurate results of geological survey were discussed for reason of tunnel collapse. According to engineering geology and construction condition in-situ, ahead ductile grouting method and long and large tube shed method were analyzed; and ahead ductile grouting method was applied to tunnel surrounding rock consolidation successfully. In order to test consolidation effect, observational method of consolidated tunnel collapse zone was constructed; convergence displacement, vault crown settlement and inner forces of steel frame were measured. It is shown from measured results, ahead ductile grouting method is the optimization method for temporary support requirements against potential collapse.
Keywords:tunnelling engineering  complex layered rock  collapse  ahead ductile grouting method  information construction  monitoring measurement
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号