首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浩布高矿区复杂地层钻进护壁堵漏技术
引用本文:李国志,杨树伟,徐景珠.浩布高矿区复杂地层钻进护壁堵漏技术[J].探矿工程,2010,37(8):23-26.
作者姓名:李国志  杨树伟  徐景珠
作者单位:[1]内蒙古自治区115地质队,内蒙古乌兰浩特137405 [2]内蒙古自治区第十地质矿产勘查开发院,内蒙古赤峰024005
摘    要:介绍了浩布高矿区复杂地层钻进中所采取的护壁堵漏技术措施。根据岩层及孔深情况采用了套管护壁堵漏、冲洗液护壁堵漏、水泥封孔护壁堵漏等措施,在实际工作中均收到了较好的效果。套管护壁堵漏简洁、护壁安全可靠;冲洗液护壁堵漏所用的人工钠土低固相泥浆对孔内坍塌、掉块具有较高的抑制功能;水泥封孔护壁堵漏效果好。套管护壁堵漏及水泥封孔护壁堵漏为绳索取心使用无固相钻井液钻进创造了条件,能有效地提高钻进效率。施工中根据钻孔实际情况所采取相应的堵漏措施,收到了良好的效果。

关 键 词:复杂地层钻进  护壁堵漏  套管  冲洗液  水泥  浩布高矿区
收稿时间:2010/2/5 0:00:00
修稿时间:2010/3/8 0:00:00

Wall Protection and Leakage Control Technical Measures for Drilling in the Complex Formation of Haobugao Mining Area
LI Guo-wei,YANG Shu-wei and XU Jing-zhu.Wall Protection and Leakage Control Technical Measures for Drilling in the Complex Formation of Haobugao Mining Area[J].Exploration Engineering(Drilling & Tunneling),2010,37(8):23-26.
Authors:LI Guo-wei  YANG Shu-wei and XU Jing-zhu
Institution:1.115 Geological Brigade of Inner Mongolia Autonomous Region,Ulanhot Inner Mongolia 137405,China;2.Inner Mongolia No.10 Institute of Geology and Mineral Exploration and Development,Chifeng Inner Mongolia 024005,China)
Abstract:The paper introduced the wall protection and leakage control technical measures for drilling in the complex formation of Haobugao mining area.According to the rock formation and the hole depth,wall protection and leakage control by casing,flushing fluid and cement sealing were adopted with good effect.Casing was safe and reliable,manual sodium soil low-solid mud has high inhibition function to downhole collapsing and block-falling,and cement has good sealing effect.Casing and cementing created favorable conditions for wire-line coring drilling with solid free drilling fluid and improved drilling efficiency.
Keywords:drilling in the complex formation  wall protection and leakage control  casing  washing fluid  cement  Haobugao mining area
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号