首页 | 本学科首页   官方微博 | 高级检索  
     检索      

多工艺联合洗井和抽水试验在CGSD-01井中的应用
引用本文:陈浩文,宋志彬,和国磊,李胜涛,许本冲,马汉臣,杜垚森,殷国乐.多工艺联合洗井和抽水试验在CGSD-01井中的应用[J].探矿工程,2019,46(6):8-13.
作者姓名:陈浩文  宋志彬  和国磊  李胜涛  许本冲  马汉臣  杜垚森  殷国乐
作者单位:中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质调查局水文地质环境地质调查中心,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所
基金项目:中国地质调查局地质调查项目“京津石地热资源调查(中国地质科学院勘探技术研究所)”(编号:DD20179032)、“天津潘庄凸起构造区地热资源调查(中国地质科学院勘探技术研究所)(编号:DD20179622)
摘    要:天津东丽湖CGSD-01井为地热勘探井,设计井深4000 m,完钻井深4051.68 m。为最大程度清理钻井过程中对含水层的堵塞,本井采用了焦磷酸钠洗井、压缩空气洗井和酸化洗井3种工艺方法联合洗井,并先后进行2次抽水试验。联合抽水试验表明多工艺联合洗井效果理想。本文主要阐述了CGSD-01井洗井及抽水试验实施工艺,以期为今后同类研究及施工提供有益的借鉴。

关 键 词:地热井  联合洗井  抽水试验  焦磷酸钠洗井  压缩空气洗井  酸化洗井
收稿时间:2019/4/18 0:00:00
修稿时间:2019/5/21 0:00:00

Application of multi-process combined well flushing and pumping test in Well CGSD-01
CHEN Haowen,SONG Zhibin,HE Guolei,LI Shengtao,XU Benchong,MA Hanchen,DU Yaosen and YIN Guoyue.Application of multi-process combined well flushing and pumping test in Well CGSD-01[J].Exploration Engineering(Drilling & Tunneling),2019,46(6):8-13.
Authors:CHEN Haowen  SONG Zhibin  HE Guolei  LI Shengtao  XU Benchong  MA Hanchen  DU Yaosen and YIN Guoyue
Institution:The Institute of Exploration Techniques, CAGS, Langfang Hebei , China,The Institute of Exploration Techniques, CAGS, Langfang Hebei , China,The Institute of Exploration Techniques, CAGS, Langfang Hebei , China,Center for Hydrogeology and Environmental Geology, CGS, Baoding Hebei , China,The Institute of Exploration Techniques, CAGS, Langfang Hebei , China,The Institute of Exploration Techniques, CAGS, Langfang Hebei , China,The Institute of Exploration Techniques, CAGS, Langfang Hebei , China,The Institute of Exploration Techniques, CAGS, Langfang Hebei , China
Abstract:The well CGSD-01 of Donglihu in Tianjin is a geothermal exploration well. The design depth of the well is 4000m and the completion depath is 4051.68m. In order to clean up the blockage of aquifer in the drilling process, the well is flushed by three methods, and pumping tests are carried out twice. This paper mainly describes the well washing and pumping test technology and process of the well CGSD-01, in order to provide useful reference for similar research in the future.
Keywords:geothermal well  increase production  well flushing  pumping test  technology and process
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号