强夯法处理某变电站红砂岩填土地基的试验研究
引用本文:黄兴怀,方玉友,吴志海.强夯法处理某变电站红砂岩填土地基的试验研究[J].探矿工程,2012,39(3):47-50.
作者姓名:黄兴怀  方玉友  吴志海
作者单位:安徽省电力设计院,安徽合肥230601
摘    要:通过对某变电站红砂岩填土地基的强夯试验研究,验证了强夯设计参数,为基础设计提供了依据,并对红砂岩地区采用强夯地基处理技术进行了探讨,供类似工程的设计、施工及检测借鉴参考。

关 键 词:红砂岩  强夯  静载荷试验  重型动力触探
收稿时间:2011/8/31 0:00:00
修稿时间:2011/8/31 0:00:00

Experiment Study on Dynamic Compaction Treatment to Red Sandstone Fill Foundation in a Substation
HUANG Xing-huai,FANG Yu-you and WU Zhi-hai.Experiment Study on Dynamic Compaction Treatment to Red Sandstone Fill Foundation in a Substation[J].Exploration Engineering(Drilling & Tunneling),2012,39(3):47-50.
Authors:HUANG Xing-huai  FANG Yu-you and WU Zhi-hai
Institution:(Anhui Electric Power Design Institute, Hefei Anhui 230601, China)
Abstract:The dynamic compaction design parameters were verified by the study on dynamic compaction test of red sandstone fill foundation in a substation, which provided the basis to foundation design. And the study was also made on dynamic compaction treatment applied in red sandstone area, which can be reference to design, construction and test of similar projects.
Keywords:red sandstone  dynamic compaction  static loading test  heavy dynamic penetration test