首页 | 本学科首页   官方微博 | 高级检索  
     检索      

汶川地震断裂带科学钻探项目尾管固井技术的应用
引用本文:樊腊生,张伟,李前贵,李旭东,赵远刚.汶川地震断裂带科学钻探项目尾管固井技术的应用[J].探矿工程,2012,39(9):32-38.
作者姓名:樊腊生  张伟  李前贵  李旭东  赵远刚
作者单位:[1]中国地质科学院探矿工艺研究所,四川成都611734 [2]中国地质调查局,北京100037 [3]江苏省地矿局第六地质大队,江苏连云港222023
基金项目:基金项目:科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题
摘    要:介绍了汶川地震断裂带科学钻探项目钻探施工过程中尾管固井技术的应用情况。针对该项目钻探施工的复杂地层条件,研发了适合于破碎地层和小套管间隙的无接箍尾管固井技术,关键技术包括尾管管柱设计、尾管下人及钻柱分离技术和施工工艺、适合于破碎地层和小套管间隙条件的尾管固井浆液设计和施工工艺。采用研发成功的尾管固井技术,在该项目的二号孔和三号孔中共进行了4次下尾管作业,均获得了成功。

关 键 词:汶川地震  地震断裂带  科学钻探  尾管  倒扣接头  固井
收稿时间:2012/8/8 0:00:00
修稿时间:2012/8/8 0:00:00

Application of Liner Cementation Technology in Wenchuan Earthquake Fault Scientific Drilling Project
FAN La-sheng,ZHANG Wei,LI Qian-gui,LI Xu-dong and ZHAO Yuan-gang.Application of Liner Cementation Technology in Wenchuan Earthquake Fault Scientific Drilling Project[J].Exploration Engineering(Drilling & Tunneling),2012,39(9):32-38.
Authors:FAN La-sheng  ZHANG Wei  LI Qian-gui  LI Xu-dong and ZHAO Yuan-gang
Institution:1. The Institute of Exploration Technology, CAGS, Chengdu Sichuan 611734, China ; 2. China Geological Survey, Beijing 100037, China ; 3. No. 6 Geological Brigade, Jiang- su Geology & Mineral Exploration Bureau, Lianyungang Jiangsu 222023, China)
Abstract:This article introduces the liner cementation technology and its application in Wenchuan earthquake scientific drilling project. According to the conditions of complex formation in this drilling project, liner cementation technology which is suitable for broken formation and small annulus between borehole and casing string, has been developed. The key points of this technology include liner string design and installation and cementing slurry design and construction. This tech- nology has been successfully used in 4 liner cementation operations.
Keywords:Wenchuan earthquake  earthquake fault  scientific drilling  liner  buckle connector  cementation
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号