首页 | 本学科首页   官方微博 | 高级检索  
     检索      

汶川地震断裂带科学钻探项目钻探事故预防与处理技术
引用本文:吴金生,贾军,段玉刚,李正前.汶川地震断裂带科学钻探项目钻探事故预防与处理技术[J].探矿工程,2012,39(9):49-52,65.
作者姓名:吴金生  贾军  段玉刚  李正前
作者单位:[1]成都理工大学,四川成都610059 [2]中国地质科学院探矿工艺研究所,四川成都611734 [3]北京探矿工程研究所,北京100083
基金项目:基金项目:科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题
摘    要:汶川地震断裂带科学钻探工程的地层条件十分复杂,岩层破碎,膨胀缩径,不确定因素多,出现多次卡、断、落等孔内事故,但都科学诊断、成功处理。通过优化钻进方法、钻具结构及泥浆体系等多种事故预防措施,最大限度地减少事故发生,保证了科学钻探工程的顺利进行。

关 键 词:汶川地震  地震断裂带  科学钻探  事故预防  事故处理
收稿时间:2012/8/8 0:00:00
修稿时间:2012/8/8 0:00:00

Drilling Accident Prevention in Wenchuan Earthquake Fault Scientific Drilling Project and the Treatment Technology
WU Jin-sheng,JIA Jun,DUAN Yu-gang and LI Zheng-qian.Drilling Accident Prevention in Wenchuan Earthquake Fault Scientific Drilling Project and the Treatment Technology[J].Exploration Engineering(Drilling & Tunneling),2012,39(9):49-52,65.
Authors:WU Jin-sheng  JIA Jun  DUAN Yu-gang and LI Zheng-qian
Institution:2 ( 1. Chengdu University of Technology, Chengdu Si- ehuan 610059, China ; 2. The Institute of Exploration Technology, CAGS, Chengdu Siehuan 611734, China; 3. Beijing Institute of Exploration Engineering, Beijing 100083, China)
Abstract:The formation conditions of Wenchuan earthquake fault scientific drilling project are very complicated. Broken rock formation, lost circulation and borehole shrinkage are encountered frequently. As a result, many drilling accidents, such as drill pipe sticking, drilling pipe breaking, objects dropping and so on happened and were successfully solved. Technical measures for preventing accidents, including scientific diagnosis and optimizing drilling method, drill tool structure and drilling mud system, have been taken to minimize accidents and ensure the smooth progress of scientific drilling project.
Keywords:Wenchuan earthquake  earthquake fault  scientific drilling  accident prevention  accident treatment
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号