首页 | 本学科首页   官方微博 | 高级检索  
     检索      

施工测量中导线控制与碎部测量同步进行的数据处理
引用本文:王礼华,郑红艳.施工测量中导线控制与碎部测量同步进行的数据处理[J].现代测绘,2007,30(2):21-22.
作者姓名:王礼华  郑红艳
作者单位:江苏省地质测绘院,江苏,南京,210008
摘    要:在施工测量中,利用全站仪开展导线控制测量与碎部测量同步进行的数据处理.该方法可提高施工测量的工作效率和测量精度,并可拓展全站仪的使用范围.

关 键 词:导线测量  碎部测量  数据处理  全站仪
文章编号:1672-4097(2007)02-0021-02

The Data Processing of Taking Control Survey the Topography and Striking Soundings at Same Time in Engineering Survey
Wang Lihua,Zheng hongyan.The Data Processing of Taking Control Survey the Topography and Striking Soundings at Same Time in Engineering Survey[J].Modern Surveying and Mapping,2007,30(2):21-22.
Authors:Wang Lihua  Zheng hongyan
Abstract:In the engineering survey,we can use total station to develop the data processing in traversing survey and detaiing survey at same time.This method can improve the the working efficiency and the measuring accuracy of engineering survey,and also can widen the working limit of total station.
Keywords:Traversing survey  Detailing survey  Data processing  Total station
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号