首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Blasting is a widely used technique for rock fragmentation in opencast mines and tunneling projects. Ground vibration is one of the most environmental effects produced by blasting operation. Therefore, the proper prediction of blast-induced ground vibrations is essential to identify safety area of blasting. This paper presents a predictive model based on gene expression programming (GEP) for estimating ground vibration produced by blasting operations conducted in a granite quarry, Malaysia. To achieve this aim, a total number of 102 blasting operations were investigated and relevant blasting parameters were measured. Furthermore, the most influential parameters on ground vibration, i.e., burden-to-spacing ratio, hole depth, stemming, powder factor, maximum charge per delay, and the distance from the blast face were considered and utilized to construct the GEP model. In order to show the capability of GEP model in estimating ground vibration, nonlinear multiple regression (NLMR) technique was also performed using the same datasets. The results demonstrated that the proposed model is able to predict blast-induced ground vibration more accurately than other developed technique. Coefficient of determination values of 0.914 and 0.874 for training and testing datasets of GEP model, respectively show superiority of this model in predicting ground vibration, while these values were obtained as 0.829 and 0.790 for NLMR model.  相似文献   

2.
The present paper mainly with deals the prediction of safe explosive charge used per delay (QMAX) using support vector machine (SVM) incorporating peak particle velocity (PPV) and distance between blast face to monitoring point (D). 150 blast vibration data sets were monitored at different vulnerable and strategic locations in and around a major coal producing opencast coal mines in India. 120 blast vibrations records were used for the training of the SVM model vis-à-vis to determine site constants of various conventional vibration predictors. Rest 30 new randomly selected data sets were used to compare the SVM prediction results with widely used conventional predictors. Results were compared based on coefficient of correlation (R) between measured and predicted values of safe charge of explosive used per delay (QMAX). It was found that coefficient of correlation between measured and predicted QMAX by SVM was 0.997, whereas it was ranging from 0.063 to 0.872 by different conventional predictor equations.  相似文献   

3.
Tunnels are required to be constructed for meeting different human needs such as power generation, transportation, underground storage, sewage etc. The predominant method of excavation, world over, is drilling and blasting owing to its capability to meet changing geo-technical conditions. Irrespective of the purpose for which the tunnels are driven, all are plagued by overbreak problems. Tunnels driven for water conveyance in hydroelectric power projects, in particular, need to be excavated with minimum overbreak to minimise cost of permanent concrete lining. Thus, predicting overbreak assumes significant importance to design site-specific blasts for minimizing rock damage. This paper presents a brief review of existing PPV (Peak Particle Velocity) based blast-induced rock damage estimation criteria and attempts to outline the ground vibration threshold levels for overbreak/rock damage in a tunnel driven through compact basalt. Rock damage manifested as overbreak is measured and correlated with the possible threshold levels of PPV. Also, the PPV levels for crack initiation and widening are proposed. The case pertains to a lake tap horizontal tunnel of Koyna Hydro-electric Power Project, India which is a water feeder tunnel for a fully underground hydroelectric power project. The tunnel was driven under a shallow rock cover of average depth ranging from 20 to 25m beneath a fully charged water body. The parting rock is mainly compact basalt. Blasting was carried out in two rounds in a controlled manner, i.e., by limiting the maximum charge per delay based on ground vibration monitoring. Ground vibration generated with free face (in second round) has been modeled and a new ground vibration propagation equation is proposed for tunnel blasting including the effect of an extra free face. The threshold limits of PPV for different degrees of overbreak/rock damage are proposed from extrapolated vibration predictor equation. The actual overbreak in the tunnel, measured using a Planimeter, varied from 2.45 per cent to 17.75 per cent of the finished tunnel area. The predicted overbreak from extrapolated PPV measurements is compared against the measured overbreak to validate the proposed blast-induced rock damage (BIRD) assessment model. The PPV level for overbreak was found to exceed 2050 mm/s in compact basalt. A linear relationship between the overbreak and maximum charge per delay is also established to design a tunnel blast in similar formations.  相似文献   

4.
Ground vibration due to blasting causes damages in the existence of the surface structures nearby the mine. The study of vibration control plays an important role in minimizing environmental effects of blasting in mines. Ground vibration regulations primarily rely on the peak particle velocity (PPV, mm/s). Prediction of maximum charge weight per delay (Q, kg) by distance from blasting face up to vibration monitoring point as well as allowable PPV was proposed in order to perform under control blasting and therefore avoiding damages on structures nearby the mine. Various empirical predictor equations have proposed to determine the PPV and maximum charge per delay. Maximum charge per delay is calculated by using PPV predictors indirectly or Q predictor directly. This paper presents the results of ground vibration measurement induced by bench blasting in Sungun copper mine in Iran. The scope of this study is to evaluate the capability of two different methods in order to predict maximum charge per delay. A comparison between two ways of investigations including empirical equations and artificial neural network (ANN) are presented. It has been shown that the applicability of ANN method is more promising than any under study empirical equations.  相似文献   

5.

Prediction and control of blast-induced ground vibration is a matter of concern in mining industry since long. Several approaches ranging from scaled distance regression, different numerical methods to wave superimposition theories have been tried by many researchers for better prediction and control of blast-induced ground vibration. Signature hole analysis is one of the popular simulation methods to predict the ground vibration generated due to production blast. It superimposes the recorded signature hole waveform using a computer program to predict the production blast-induced vibration. The technique inputs the designated time of detonation of each hole and superimposes the waves generated by each hole to predict the nearest value of peak particle velocity and frequency of blast-induced ground vibration. Although a very useful approach, it requires a computer program to simulate the linear superimposition of waveforms. The simulation is not possible for every blast as it takes time and also is difficult for field engineers to simulate every time, whereas it is always easy for blasting engineers to adapt and use an empirical equation/approach for prediction and control of blast-induced ground vibration than simulation. In this paper, an attempt has been made to develop an innovative and simplified analytical approach of signature hole analysis. The simplified sinusoidal wave equation is obtained from recorded signature hole ground vibration waveform properties and is superimposed mathematically according to the multi-hole blast design to predict the production blast-induced ground vibrations. The validation of the developed approach was done in three different sites, and up to 15% more accuracy in prediction of the blast, vibrations are achieved in comparison with signature hole analysis prediction.

  相似文献   

6.
A database of ground vibration due to blasting at 27 limestone quarries, located in various parts of India, has been created. The database contains peak particle velocity (PPV), frequency, other vibration related and blast design parameters. Regression analysis of the data is carried out to derive site constants of the USBM predictor equation for individual quarries. It is found that these site constants are correlated with each other. By combining all the data, a generalised predictor equation is developed to assess and control ground vibration. In addition, mean zone of attenuation has been delineated using the predictor equations of the individual quarries. The dominant frequency of ground vibration with respect to distance and the possibility of modifying it by changing delay intervals in production blasts are also examined.  相似文献   

7.
This research was performed on the quarry that will be opened to produce aggregates and rock filling material at Catalagzi region at Zonguldak province in Turkey. However, there are some structures which can be adversely affected by blasting at the quarry. These structures are a methane exploration drill hole and a house at the distances of 340 and 390 m, respectively. One of the main goals of this study is to perform a preliminary assessment of possible damage effect of ground vibrations induced by blasting on these structures by risk analysis based on ground vibration measurements. In order to propose a preliminary blast design models separately for aggregate and rock filling material production, six test shots with different maximum charge per delay were planned and fired at the quarry. In these shots, 90 events were recorded. To predict peak particle velocity (PPV), the relationship between the recorded peak particle velocities and scaled distances were investigated. During this investigation, the data pairs were statistically analyzed and a PPV prediction equation specific to this site with 95% prediction line were obtained. And also, this equation was used in the derivation of the practical blasting charts specific to this site as a practical way of predicting the peak particle velocity and maximum charge per delay for future blasting. A risk analysis was performed by using this equation. In the light of this analysis, preliminary blast design models were proposed to be used in this quarry for aggregate and rock filling material production.  相似文献   

8.
The present paper mainly deals with the prediction of maximum explosive charge used per delay (Q MAX) using an artificial neural network (ANN) incorporating peak particle velocity (PPV) and distance between blast face to monitoring point (D). One hundred and fifty blast vibration data sets were monitored at different vulnerable and strategic locations in and around major coal producing opencast coal mines in India. One hundred and twenty-four blast vibrations records were used for the training of the ANN model vis-à-vis to determine site constants of various conventional vibration predictors. The other 26 new randomly selected data sets were used to test, evaluate and compare the ANN prediction results with widely used conventional predictors. Results were compared based on coefficient of correlation (R), mean absolute error and mean squared between measured and predicted values of Q MAX. It was found that coefficient of correlation between measured and predicted Q MAX by ANN was 0.985, whereas it ranged from 0.316 to 0.762 by different conventional predictor equations. Mean absolute error and mean squared error was also very small by ANN, whereas it was very high for different conventional predictor equations.  相似文献   

9.
Enhanced demand for coal and minerals in the country has forced mine operators for mass production through large opencast mines. Heavy blasting and a large amount of explosive use have led to increased environmental problems, which may have potential harm and causes a disturbance. Ground vibrations generated due to blasting operations in mines and quarries are a very important environmental aspect. It is clear that a small amount of total explosive energy is being utilized in blasting for breakage of rock mass, while the rest is being wasted. The amount of energy which is wasted causes various environmental issues such as ground vibrations, air overpressure, and fly rock. Ground vibrations caused by blasting cannot be eliminated entirely, yet they can be minimized as far as possible through a suitable blasting methodology. A considerable amount of work has been done to identify ground vibrations and assess the blast performance regarding the intensity of ground vibrations, i.e., peak particle velocity and frequency spectrum. However, not much research has done into reducing the seismic energy wasted during blasting leading to ground vibrations. In this paper, the blast-induced ground vibrations in three orthogonal directions, i.e., transverse, vertical, and longitudinal, were recorded at different distances using seismographs. An attempt has been made for the estimation of the percentage of explosive energy dissipated in the form of seismic energy with electronic and non-electric (NONEL) initiation system. signal processing techniques with the help of DADiSP software is used to study the same.  相似文献   

10.
Far-field peak particle velocity (PPV) measurements were made in the roof while blasting in coal development drivages at Tandsi Mine, Western Coalfields Limited, India. The roof was fragile at this mine and was posing constant support problems for mining, resulting in low productivity. The PPV measurements have been used to decipher the damage zone in the roof. The extent of damage obtained has been compared to establish the threshold limits for the damage zone. Conversely, the maximum charge per delay that can be exploded is calculated and a suitable blast design has been recommended for maintaining the roof stability and pull. A roof vibration predictor equation has been developed that shows a consistent trend indicating that it may have future use in a similar geo-mining setup. The blast pattern recommended has reduced the damage extent, though marginally, but helped in improving pull. Critical PPV for incipient rock damage in underground coal mine development drivages under fragile roof were computed. The PPV level for incipient crack growth was found to vary from 500 to 800 mm/s while for overbreak it varied from 800 to 1200 mm/s. It was also observed that the location of cut holes, charge concentration and firing sequence were found to be responsible for the difference in their damage potential.  相似文献   

11.
Blasting constitutes a beneficial industrial technology, used in quarries and mining production processes, which ensures the achievement of the expected results in a short period of time with relatively low cost. Nevertheless, a significant part of the used blasting energy is wasted in the form of ground vibration and air blast. Hence, blasting-induced ground vibrations are one of the fundamental problems in the mining industry which may cause severe damage to structures and plants nearby. Therefore, a vibration control study plays an important part in the minimization of the environmental effects of blasting in mines. This study represents an investigation reporting ground motion (measured in terms of peak particle velocity (mm/s)) and air blast overpressure measurements around the open-pit phosphate mine near Metlaoui area (southwestern Tunisia). It aimed to calculate the site’s constants: K (ground transmission coefficient) and n (site attenuation curve slope). The obtained site parameters allowed determining the propagation equation of the blast-induced seismic waves in the study area. The scope of this study was to predict the peak particle velocity when the amount of explosive charge and/or the distance were altered with minimum spoil to the environment. Also, a frequency overview of the study area revealed the dominance of low frequencies (>?40 Hz). Such values can cause damage to the nearby structures when a specific peak particle velocity value is reached by blasting. Moreover, this study demonstrated that all overpressure magnitudes were less than 134 dB, which is the safe limit of air blast level.  相似文献   

12.
Environmental impact of blasting at Drenovac limestone quarry (Serbia)   总被引:1,自引:1,他引:0  
In present paper, the blast-induced ground motion and its effect on the neighboring structures are analyzed at the limestone quarry "Drenovac" in central part of Serbia. Ground motion is examined by means of existing conventional predictors, with scaled distance as a main influential parameter, which gave satisfying prediction accuracy (R > 0.8), except in the case of Ambraseys–Hendron predictor. In the next step of the analysis, a feed-forward three-layer back-propagation neural network is developed, with three input units (total charge, maximum charge per delay and distance from explosive charge to monitoring point) and only one output unit (peak particle velocity). The network is tested for the cases with different number of hidden nodes. The obtained results indicate that the model with six hidden nodes gives reasonable predictive precision (R ≈ 0.9), but with much lower values of mean-squared error in comparison to conventional predictors. In order to predict the influence level to the neighboring buildings, recorded peak particle velocities and frequency values were evaluated according to United States Bureau of Mines, USSR standard, German DIN4150, Australian standard, Indian DMGS circular 7 and Chinese safety regulations for blasting. Using the best conventional predictor, the relationship between the allowable amount of explosive and distance from explosive charge is determined for every vibration standard. Furthermore, the effect of air-blast overpressure is analyzed according to domestic regulations, with construction of a blasting chart for the permissible amount of explosive as a function of distance, for the allowable value of air-blast overpressure (200 Pa). The performed analysis indicates only small number of recordings above the upper allowable limit according to DIN4150 and DMGS standard, while, for all other vibration codes the registered values of ground velocity are within the permissible limits. As for the air-blast overpressure, no damage is expected to occur.  相似文献   

13.
This paper presents the results of ground vibration measurements carried out in Hisarcik Boron open pit mine located on the west side of central Anatolia near Kütahya province in Turkey. Within the scope of this study to predict peak particle velocity (PPV) level for this site, ground vibration components were measured for 304 shots during bench blasting. In blasting operations, ANFO (blasting agent), gelatin dynamite (priming), and delay electric detonators (firing) were used as explosives. Parameters of scaled distance (charge quantity per delay and the distance between the source and the station) were recorded carefully and the ground vibration components were measured for all blast events using two different types of vibration monitors (one White Mini-Seis and one Instantel Minimate Plus Model). The absolute distances between shot points and monitor stations were determined using GPS. The equation of square root scaled distance extensively used in the literature was taken into consideration for the prediction of PPV. Then, the data pairs of scaled distance and particle velocity obtained from the 565 event records were analyzed statistically. At the end of statistical evaluation of the data pairs, an empirical relation which gives 50% prediction line with a reasonable correlation coefficient was established between PPV and scaled distance.  相似文献   

14.
This study evaluates the impacts resulting from quarry-blasting operation on nearby buildings and structures as it generates ground vibration, air blast, and fly rocks. In this paper, first blasting operation and its possible environmental effects are defined. Then the methods of blast-vibration prediction and commonly accepted criteria to prevent damage were introduced. A field experimental work was conducted to minimize the vibration effects at Saribayir quarry as it is an identical case for the many quarries situated in and around Istanbul, Turkey. Although the local surrounding geology and rock mechanics have great influence on vibrations as uncontrollable parameter, the charge weight per delay, delay period, geometric parameters of the blasts were changed to solve the existing vibration problem in the studied quarry. To obtain a realistic result, 10 blasts were carried out and 30 seismic records were made in different places mainly very close the buildings and the other vulnerable structures around the quarry. The evaluation is performed whether the vibration level are within safe limits or not. The prediction equation based on scaled distance concept is also determined, however, it is a site-specific model and need to be updated when the quarry advances. The safe blast parameters which minimize the environmental effect were determined for the Saribayir quarry.  相似文献   

15.
Directives from the Hon’ble Supreme Court of India led to the banning of mining activities within a radius of 2 km of the Sri Jambunatheswara ancient temple in Hospet taluk of Karnataka State of India. On recommendation of the Department of Archaeology & Museums, Government of Karnataka, CSIR-CIMFR undertook extensive investigations wherein the ground vibration and air overpressure due to blasting in nearby iron ore mines were monitored to assess their damage and annoyance potentials. The magnitudes of blast-induced ground vibration and air-overpressure recorded in the temple were found to be within the standard safe limits stipulated by the Directorate General of Mines Safety, India when trial blasts were carried out at a distance greater than 290 m from the temple. When blasts were conducted at a distance of beyond 845 m from the temple, neither vibration nor sound of blasting could be recorded or heard at the temple premises, indicating it a safe zone for blasting. After thorough analyses of the recorded data, precise blast design parameters were recommended for blasting at distances beyond 200 m from the temple and allowing this distance to be demarcated as the safe zone where controlled blasting could ensure safety of the ancient temple.  相似文献   

16.
龙滩水电站右岸导流洞开挖中爆破损伤范围研究   总被引:10,自引:0,他引:10  
根据确定岩石爆破中爆源近区的质点峰值震动速度衰减规律的波动方法,导出了岩石爆破中岩体损伤范围的计算式。结合岩体爆破损伤的质点峰值震动速度安全判据,就龙滩水电站右岸导流洞爆破开挖工程中岩体损伤范围进行了计算,并对理论计算结果与围岩损伤范围的声波法检测结果进行了对比与分析。  相似文献   

17.
Prediction of blast-induced air overpressure using support vector machine   总被引:2,自引:1,他引:1  
Prediction of blast-induced air overpressure (AOP) is very complicated and intricate due to the number of influencing parameters affecting air wave propagation. In this paper, an attempt has been made to predict the blast-induced AOP by support vector machine (SVM) using maximum charge per delay and distance from blast-face to monitoring station of AOP. To investigate the suitability of this approach, SVM predictions are compared with a generalized predictor equation. Seventy-five air blasts were monitored at different locations around three mines. AOP data sets of two limestone mines are taken for the training and testing of the SVM network as well as to determine site constants for generalized equation. The remaining mine data sets are used for the validation and comparison of AOP.  相似文献   

18.
Blast Design Using Measurement While Drilling Parameters   总被引:1,自引:0,他引:1  
Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collection for laboratory tests, MWD techniques can not only save time but also improve the reliability of the blast design by providing the drill and blast engineer with the information specially tailored for use. While most mines use a standard blast pattern and charge per blasthole, based on a single rock factor for the entire bench or blast region, information derived from the MWD parameters can improve the blast design by providing more accurate rock properties for each individual blasthole. From this, decisions can be made on the most appropriate type and amount of explosive charge to place in a per blasthole or to optimise the inter-hole timing detonation time of different decks and blastholes. Where real-time calculations are feasible, the system could extend the present blast design even be used to determine the placement of subsequent holes towards a more appropriate blasthole pattern design like asymmetrical blasting.  相似文献   

19.
ABSTRACT

This study develops a mathematical model of buried pipelines subjected to surface blast loading based on the theory of beam on elastic foundation. The Fourier transform, a mathematical formula that converts the time domain of the problem to the frequency domain, was used in order to solve a fourth-order non-homogeneous partial differential equation. Transforming the solution back to the time domain, the blast-induced Peak Particle Velocity (PPV) of the pipeline can be calculated. In addition to the mathematical model, a three-dimensional finite element model has been established, thereby drawing a comparison between analytical and numerical results. It can be concluded that the analytically calculated PPV values are found to be higher than the corresponding numerical values. Lastly, the safe distance from the pipeline to blast source and the maximum allowable ANFO explosive weight for two types of rock have been presented in the form of graphs by imposing a limit of 50 mm/s for PPV. This comparative study has investigated the effect of road-cut excavation blasting on pipelines buried under only two types of rock mass. However, it can be used for different types of rock and explosives, mainly thanks to the comprehensiveness of the analytical solution.  相似文献   

20.
本文根据波力电站岩坎爆破的特点,提出了用多段毫秒雷管一次起爆进行周边预裂爆破、深孔削坡爆破和主坎斜孔抛掷爆破的程序,建立了药量计算的公式,分析了爆破震动对波力电站气室和机房的影响,论述了波力电站岩坎爆破的技术理论与工艺方法。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号