泥沙问题是三峡工程建设与运行中的关键技术问题之一,只有妥善处理好泥沙问题,才能保证三峡工程长期有效使用,维持水库功能的全面发挥。本文首先结合实测水文、河道地形观测资料,对三峡水库运行近20年来的泥沙淤积特性及水库排沙比进行了较为全面的分析研究,并与已有研究成果进行了对比;其次,围绕防洪、航运以及坝前段的泥沙淤积等方面,进一步分析了水库淤积产生的影响。结果表明:三峡水库蓄水以来,在不考虑区间来沙的情况下,三峡水库共淤积泥沙20.484亿t,近似年均淤积1.102亿t,水库排沙比为23.6%,水库年均淤积量为原论证预测值的33%。其中,库区干流段累计淤积泥沙17.835亿m3(变动回水区冲刷0.694亿m3;常年回水区淤积18.529亿m3),淤积在水库防洪库容内的泥沙为1.648亿m3(干、支流分别淤积1.517亿m3和0.131亿m3),占水库防洪库容的0.74%,“十一五”攻关阶段研究得出的多年平均淤积量及排沙比较实测值均偏大,变动回水区冲淤则出现反向的...  相似文献   

2.
This article addresses sediment research carried out for the Three Gorges Project since 1993, when the construction of the project was formally started. Emphasis of the research has been placed on the solution of relevant problems arising from design and construction of various structures, including sedimentation problems in the Chongqing reach; layout of the upper lock approach channel and ways and means to mitigate its deposition; increasing reservoir capacity by optimizing reservoir operation; compensating depth of flow required by navigation below the Gezhouba Project caused by scouring; mitigation of adverse effects of erosion on the reach from Zhicheng to Jiangkou; and evaluating scour of the Jinjiang reach caused by releasing flows of low concentrations from the TGP. In addition, reduction of the sediment load entering into the reservoir area of the TGP in the recent years as well as that expected of the projected construction of large hydropower stations on the Jinsha River upstream of the TGP reservoir is also noted and discussed.  相似文献   

3.
ON SOME KEY SEDIMENTATION PROBLEMS OF THREE GORGES PROJECT (TGP)   总被引:1,自引:0,他引:1  
I. INTRODUCTIONThe Three Gorges Project (TGP) being planned is to be located on the Yangtze River at Sandouplug, 44 km upstream of Yichang (Fig. l). A scheme studied in the feasibility stage has the crest ofthe dam placed at 185 m with a maximums height o…  相似文献   

4.
STUDYOFMETHODOLOGYFORPHYSICALMODELINGOFSEDIMENTATIONINRESERVOIRYANGGuowei(TheEnglishtexthasbeenreviewedbyMr.CAIXiaoyongandedi...  相似文献   

5.
Construction of large dams is attractive because of their great benefits in flood control,hydropower generation,water resources utilization,navigation improvement,etc.However,dam construction may bring some negative impacts on sediment transport and channel dynamics adjustments.Due to the effects of recent water and soil conservation projects,sediment retention in the newly constructed large upstream reservoirs,and other factors,the sedimentation in the Three Gorges Reservoir(TGR)is quite different from the amount previously predicted in the demonstration stage.Consequently,based on the measured data,characteristics of sedimentation and the related channel deformation in the TGR were analyzed.The results imply that sediment transport tended to be reduced after the Three Gorges Project(TGP).Sedimentation slowed dramatically after 2013 and indicated obvious seasonal characteristics.Due to the rising water level in the TGR in the flood season,the yearly sediment export ratio(Eratio)was prone to decrease.The water level near the dam site should be reasonably regulated according to the flow discharge to improve the sediment delivery capacity and reduce sedimentation in the TGR,and to try to avoid situations where the flood retention time is close to 444 h.The depositional belt was discontinuous in the TGR and was mainly distributed in the broad reaches,and only slight erosion or deposition occurred in the gorge reaches.Sedimentation in the broad and gorge reaches accounted for 93.8% and 6.2% of the total sedimentation,respectively.The estuarine reach located in the fluctuating backwater area experienced alternate erosion-deposition,with a slight accumulative deposition in the curved reach.Sedimentation mainly occurred in the perennial backwater area.The insight gained in this study can be conducive to directly understanding of large reservoir sedimentation and mechanism of channel adjustment in the reservoir region in the main channel of large river.  相似文献   

6.
Based on long-term measurements at three gauging stations, Toudaoguai, Fugu and Hequ, and one meteorological station, this article discusses the features of discharge (Q) and sediment concentration (Cs) of a river reach of the Yellow River with a reservoir located in the Loess Plateau. The impacts of the local sub-watershed between Toudaoguai and Fugu gauging stations on sediment budget to the Yellow River have been analyzed. In addition, the deposition processes in the Tianqiao Reservoir have been investigated. Results show over 80% of the precipitation that falls in the local subwatershed is unable to contribute to the Yellow River runoff process. It is found that the annualmaximum sediment concentration is usually less than 30 kg/m^3 during flood seasons at Toudaoguai Gauging Station, but the sediment concentration varies dramatically at Fugu Gauging Station. About 35% of the sediment eroded in the sub-watersheds between Toudaoguai and Fugu gauging stationswas produced from the Huangfuchuan sub-watershed which has a drainage area accounting only for 10% of the drainage area between Toudaoguai and Fugu gauging stations. The Tianqiao Reservoir generally has deposition during the summer flood season, and scouring during the non-flood season.On average, over 85% of deposited sediment in the reservoir occurs in the 12 km long lower reservoir reach. The volume of annual deposition in the reservoir mainly depends on the volume of water from the local region between Hequ and Fugu gauging stations.  相似文献   

7.
1INTRODUCTIONFrom14toearly20century,thatisintheMingandQingDynastiesinChina,thereexistedapointofviewthatthecontinuoussiltation...  相似文献   

8.
A MATHEMATICAL MODEL FOR RESERVOIR SEDIMENTATION AND FLUVIAL PROCESSES   总被引:3,自引:1,他引:3  
I. INTRODUCTIONAt present moot sediment transport models applied in engineering practice are based on equilibriumsediment transport approach, i. e. sediment--carrying Capacity is used to replace the actual sediment concentration (ref. 1 -- 9). However, the sediment--carrying capacity, in general, is not equal to sedimentconcentration, they may differ a lot especially for the case of reservoir sedimentation process and/orthe scouring process of river channel in the downstream of a reservoi…  相似文献   

9.
An attempt of using stochastic hydrologic technique to assess the intrinsic risk of reservoir operation is made in this study. A stochastic simulation model for reservoir operation is developed. The model consists of three components: synthetic generation model for streamflow and sediment sequences, one-dimensional delta deposit model for sediment transport processes in reservoirs, and simulation model for reservoir operation. This kind of integrated simulation model can be used to simulate not only the inflow uncertainty of streamflow and sedimentation, but also the variation in operation rules of reservoirs. It is herein used for the risk assessment of a reservoir, and the simulation is performed for different operation scenarios. Simulation for the 100-year period of sediment transport and deposition in the river-reservoir system indicates that the navigation risk is much higher than that of hydropower generation or sediment deposition in the reservoir. The risk of sediment deposition at the river-section near the backwater profile is also high thereby the navigation at the river-segment near this profile takes high risk because of inadequate navigation depth.  相似文献   

10.
I. INTRODUCTIONThe Yellow River is a heavily sediment--laden river. The sediment load of the Yellow River ranks the first in the world while its annual runoff is only of medium size. Toharness the river, it is necessary to build reservoirs for regulating runoff to meet the demands of economic development. Since the founding of PRC in 1949, I S4 large and medium--sized reservoirs have been constructed on the main stem and the tributaries with atotal storage capacity of 84.5 billion m3.…  相似文献   

11.
The construction of hydropower projects,such as Xiluodu and Xiangjiaba Reservoirs,in the upper Yangtze River will lead to variations of the incoming water and sediment conditions and in turn changes in the deposition and erosion processes in the fluctuating backwater reach of the Three Gorges Project(TGP).In this paper,based on the water and sediment characteristics,a 2D mathematical model in the boundary-fitting orthogonal curvilinear coordinate system has been employed to predict the space-time changes of...  相似文献   

12.
The characteristics of water flow and sediment transport in a typical meandering and island-braided reach of the middle Yangtze River is investigated using a two-dimensional (2D) mathematical model. The major problems studied in the paper include the carrying capacity for suspended load, the incipient velocity and transport formula of non-uniform sediment, the thickness of the mixed layer on the riverbed, and the partitioning of bed load and suspended load. The model parameters are calibrated using extensive field data. Water surface profiles, distribution of flow velocities, riverbed deformation are verified with site measurements. The model is applied to a meandering and island-braided section of the Wakouzi-Majiazui reach in the middle Yangtze River, which is about 200 km downstream from the Three Gorges Dam, to study the training scheme of the navigation channels. The model predicts the processes of sediment deposition and fiver bed erosion, changes of flow stage and navigation conditions for the first 20 years of impoundment of the Three Gorges Project.  相似文献   

13.
In the light of the regional physiography and its effect on clay mineral composition of cohesive sediment (d < 0.005 mm) the source area of cohesive sediment in the Yangtze Estuary can be identified as three supplying regions: the main stem of the Yangtze River, the deltaic region of the abandoned Yellow River including the northwest Huanghai Sea and the Hangzhou Bay. Based on the evaluation of clay mineral composition in the supplying regions and the converging region, a computational model is established. More than 89.6% of cohesive sediment comes from the Yangtze River, a considerable amount is replenished from the deltaic region of the abandoned Yellow River while some part of the cohesive sediment load is transported from the Yangtze Estuary to the Hangzhou Bay. Computation results reveal that the annual deposit of cohesive sediment in the Yangtze Estuary amounts to 45.54 x 106 t. The annual cohesive sediment load replenished from the deltaic region of the abandoned Yellow River is 27.30 x 106t, while the annual cohesive sediment load transported to the Hangzhou Bay is 22.47 x 106 t. The amount of deposit in the Yangtze Estuary has been checked against the value obtained by comparing bathemetry of the Yangtze Estuary in 1915 and 1963.  相似文献   

14.
1 BACKGROUND The Illinois River is the most significant river in the state of Illinois. The river drains nearly half of the state and has a drainage area of 28,906 mi2 (74,867 km2). Except for about a 4,000 mi2 (10,360 km2) area in Indiana and Wisconsin, the watershed is located in Illinois (see Fig. 1). The watershed contains the drainage basins of several of the state's significant rivers such as the Sangamon, LaMoine, Spoon, Mackinaw, Vermilion, Fox, Kankakee, and Des Plaines Ri…  相似文献   

15.
筑坝拦截对黑河河道沉积物粒度空间分布的影响   总被引:2,自引:1,他引:1  
河流沉积物对流域环境变化具有敏感响应,其粒度参数能反映沉积环境中物质来源和水动力环境.本文以黑河流域上中游为研究区域,探究河流沉积物粒度对流域环境变化的响应.从黑河上中游干流22个主要控制断面采集河床沉积物样品,采用筛分法和吸管法对沉积物样品粒度参数进行测定,并分析其空间分布规律对筑坝拦截为主的环境改变响应.研究结果表明:受梯级水库建设影响,黑河上中游泥沙粒径大小差异显著.干流库区泥沙粒径较自然河段明显减小,分选很好,呈正偏或极正偏尖锐分布,而且在库区不同沉积高度上表现出分层沉积特征;坝下游河段因遭受强烈冲刷,较自然河段泥沙粒径粗化显著,分选变差,偏态趋向极正偏,峰态尖锐化;水库回水区受水库壅水及下泄清水的双重制约,泥沙粒度参数介于自然河段和坝下游河段之间,整体分选中等,呈极正偏尖锐分布;沉积环境分析表明,上游支流河段沉积物粒度特征受泥沙供给和物源特征的影响较水动力条件显著,干流河段沉积物粒度特征主要受水动力条件控制.研究结果既符合河流上中游沉积物粒度分布规律,也反映了河流环境变化对沉积物粒度组成的影响.  相似文献   

16.
I. INTRODUCTIONResistance to flow in alluvial streams is one of the crucial problems in fluvial hydraulics. Despite that large amount of studies have been conducted for centuries, no perfectmethod describing and calculating the resistance to flow in alluvial streams is availablehll now. Investigation on bed forms and resistance properties of light--weight bed materials is even more scarce. USWES (1936) has conducted systematic experiments onlight--weight materials in a flume & m long an…  相似文献   

17.
IINTRODUCTIONLanddevelopmentandlandusepatternsinthewatershedcaninduceincreasedsedimentloadsinriversandstreams.AGREATIllstudy(1982)illustratedthatsedimentyieldsfromagriculturallandcouldbeseveralfoldsmorethanothertypeoflandusesanderosionsources.ThesamestudyalsodemonstratedthatfinesedimentsweretheheaviestportionoftotalsoillossesfromeachtypeoflandusesinthetwelvehydrologicareasitinvestigatedintheUMRS.Thesamecouldbetrueforotheruplandareasalso.Howeverfinesediments,formthewashloadofthestream…  相似文献   

18.
1THETESTREACHANDDREDGINGIN1997~1998TheYellowRiverhasextended38kmfartherintotheseaeversincethechangeoftherivercourseattheestuarytotheQingshuigouflowpathin1976.InMay1996therivercoursewaschangedtoabranchatthepointof950mabovetheCSQSandtheriverlengthwas16kmshorterthanbefore.Conditionsofincomingwaterandsedimentduringthefloodseasonof1996werefavorablesuchthat3].6milliontonsofsedimentwerescouredbelowLain.Amongthem,11.6milliontonswerescouredbetweenakinandXihekou(47.5km)and2040milliontonswe…  相似文献   

19.
金沙江下游4个梯级水电站总装机容量相当于两座三峡水库,是“西电东送”中部地区的源头工程,工程效益发挥对经济社会发展意义重大。2012年以来,向家坝、溪洛渡、乌东德和白鹤滩电站等陆续蓄水运行,层层拦截金沙江的泥沙,2013—2020年向家坝出库年输沙量均值下降至152万t,减幅超过99%。大量泥沙淤积在梯级水库内,同时向家坝以下河道发生长距离冲刷。本文以自金沙江下游工程筹建以来的观测资料为基础,针对梯级水库的泥沙淤积和坝下游河道冲刷规律开展研究,结果表明:金沙江下游四个梯级电站自建成运行至2020年底,累计淤积泥沙约5.98亿m3,其中溪洛渡库区淤积量占比达92.5%,2013-2020年溪洛渡和向家坝水库排沙比分别为2.64%和22.2%,其水库泥沙主要淤积在常年回水区的干流河道内,以死库容内淤积为主,侵占有效库容的比例小于1.3%。金沙江下游库区干流河道的峡谷特征明显,淤积多表现为主河槽的平铺式淤高。溪洛渡和向家坝库区淤积的泥沙沿程分选特征明显,越靠近坝前,中数粒径减小、细颗粒泥沙沙量百分数增加,极细颗粒泥沙会在库区一定范围内大量沉积。向家坝下游河床普遍冲刷,但...  相似文献   

20.
Observation of the operation of the Sanmenxia Reservoir on the Yellow River has led to the conclusion that to preserve a certain effective storage volume for reservoirs built on heavily silt-laden rivers is feasible if the reservoir is operated according to the principle known as "storing the clear water and discharging the muddy flow". The relative stability of the bed elevation at the end of the backwater and the reservoir's erosion and deposition equilibrium depend on the compatibility of the pool level maintained in non-flood seasons with the conditions of flow and sediment load during flood seasons. Operating the reservoir to regulate the flood and sediment load during flood seasons can reduce the rate of aggradation in the Lower Yellow River. The basic condition for applying the operation mode of "storing the clear water and discharging the muddy flow" is that a sufficient amount of water should be used for discharging sediment during flood seasons. Under the condition of extremely low flow years, reservoir sedimentation cannot be avoided even if this operation mode is adopted.  相似文献   