首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Streamflow forecasts are updated periodically in real time, thereby facilitating forecast evolution. This study proposes a forecast-skill-based model of forecast evolution that is able to simulate dynamically updated streamflow forecasts. The proposed model applies stochastic models that deal with streamflow variability to generate streamflow scenarios, which represent cases without forecast skill of future streamflow. The model then employs a coefficient of prediction to determine forecast skill and to quantify the streamflow variability ratio explained by the forecast. By updating the coefficients of prediction periodically, the model efficiently captures the evolution of streamflow forecast. Simulated forecast uncertainty increases with increasing lead time; and simulated uncertainty during a specific future period decreases over time. We combine the statistical model with an optimization model and design a hypothetical case study of reservoir operation. The results indicate the significance of forecast skill in forecast-based reservoir operation. Shortage index reduces as forecast skill increases and ensemble forecast outperforms deterministic forecast at a similar forecast skill level. Moreover, an effective forecast horizon exists beyond which more forecast information does not contribute to reservoir operation and higher forecast skill results in longer effective forecast horizon. The results illustrate that the statistical model is efficient in simulating forecast evolution and facilitates analysis of forecast-based decision making.  相似文献   

2.
In 1988, an important publication moved model calibration and forecasting beyond case studies and theoretical analysis. It reported on a somewhat idyllic graduate student modeling exercise where many of the system properties were known; the primary forecasts of interest were heads in pumping wells after a river was modified. The model was calibrated using manual trial-and-error approaches where a model's forecast quality was not related to how well it was calibrated. Here, we investigate whether tools widely available today obviate the shortcomings identified 30 years ago. A reconstructed version of the 1988 true model was tested using increasing parameter estimation sophistication. The parameter estimation demonstrated the inverse problem was non-unique because only head data were available for calibration. When a flux observation was included, current parameter estimation approaches were able to overcome all calibration and forecast issues noted in 1988. The best forecasts were obtained from a highly parameterized model that used pilot points for hydraulic conductivity and was constrained with soft knowledge. Like the 1988 results, however, the best calibrated model did not produce the best forecasts due to parameter overfitting. Finally, a computationally frugal linear uncertainty analysis demonstrated that the single-zone model was oversimplified, with only half of the forecasts falling within the calculated uncertainty bounds. Uncertainties from the highly parameterized models had all six forecasts within the calculated uncertainty. The current results outperformed those of the 1988 effort, demonstrating the value of quantitative parameter estimation and uncertainty analysis methods.  相似文献   

3.
4.
On the basis that hydrological users need to know the forecast uncertainty at the time that the forecast is issued, we computed distributions of radar rainfall forecast uncertainty as a function of forecast lead time, basin size, and forecasted rainfall intensity using data from the US 3-D National Mosaic of radar data. We document how exceptional forecasts such as those of heavy rainfall are generally biased. Since forecast uncertainty is also weather dependent, we tried to find good predictors to help either reduce the forecast uncertainty or better define it. These predictors were based either on characteristics of the current precipitation field or on the performance of the nowcast in the immediate past. The value of some predictors, especially those based on the properties of large-scale rainfall patterns, was significant though modest, the predictors being generally more skillful at characterizing forecast uncertainty than at improving forecast accuracy.  相似文献   

5.
This paper presents the development of an adaptive, non-parametric forecast model for the direct prediction of the spatial distribution of the Modified Mercalli Intensity (MMI) corresponding to an earthquake scenario. The model is based on recent advances in neural networks computation, and is constructed through supervised learning using historical earthquake and regional geological data as training sets. A MMI forecast model for moderate earthquakes with magnitudes between 6 and 7 was developed based on data from the Loma Prieta, Coalinga and Morgan Hill earthquakes. For these data sets, the neural networks forecast model is shown to have excellent data synthesis capability; multiple sets of data can be encapsulated by a relatively simple network architecture. Limited comparison of forecasts made by the neural networks model and conventional models demonstrates that improved accuracy can be achieved. Implementation and operational advantages of the neural networks approach such as general input features, minimum preconceived knowledge of the data sets, the ability to learn and to adapt incrementally and the autonomous and automatic synthesis of the structure underlying the data sets, have been illustrated.  相似文献   

6.
Real time updating of rainfall-runoff (RR) models is traditionally performed by state-space formulation in the context of flood forecasting systems. In this paper, however, we examine applicability of generalized likelihood uncertainty estimation (GLUE) approach in real time modification of forecasts. Real time updating and parameter uncertainty analysis was conducted for Abmark catchment, a part of the great Karkheh basin in south west of Iran. A conceptual-distributed RR model, namely ModClark, was used for basin simulation, such that the basin’s hydrograph was determined by the superposition of runoff generated by individual cells in a raster-based discretization. In real time updating of RR model by GLUE method, prior and posterior likelihoods were computed using forecast errors that were obtained from the results of behavioral models and real time recorded discharges. Then, prior and posterior likelihoods were applied to modify forecast confidence limits in each time step. Calibration of parameters was performed using historical data while distribution of parameters was modified in real time based on new data records. Two scenarios of rainfall forecast including prefect-rainfall-forecast and no-rainfall-forecast were assumed in absence of a robust rainfall forecast model in the study catchment. The results demonstrated that GLUE application could offer an acceptable lead time for peak discharge forecast at the expense of high computational demand.  相似文献   

7.
Forecasting skill of model averages   总被引:1,自引:1,他引:0  
Given a collection of science-based computational models that all estimate states of the same environmental system, we compare the forecast skill of the average of the collection to the skills of the individual members. We illustrate our results through an analysis of regional climate model data and give general criteria for the average to perform more or less skillfully than the most skillful individual model, the “best” model. The average will only be more skillful than the best model if the individual models in the collection produce very different forecasts; if the individual forecasts generally agree, the average will not be as skillful as the best model.  相似文献   

8.
大别山库区降水预报性能评估及应用对策   总被引:1,自引:0,他引:1  
对降水预报进行性能评估及应用对策研究可以更好地发挥降水预报在水库调度中的决策支持作用.基于大别山库区近10 a汛期(2007—2016年5月1日—9月30日)24~168 h共7个预见期降水预报和地面降水观测资料,采用正确率、TS评分、概率统计、ROC曲线以及CTS等方法评估大别山库区降水预报性能,并以响洪甸水库为重点研究区域分析降水预报在水库调度中的应用对策.结果表明:1)大别山库区各量级的降水预报都有正预报技巧;24~72 h预见期降水预报的TS评分较高且空报率、漏报率也较低,具有较高的预报性能;但96 h及以上预见期降水预报性能明显下降,中雨以上量级空报率、漏报率较大,特别是对大暴雨及其以上量级的降水预报性能显著下降.2)大别山库区预报降水量级与实况降水量级基本符合,预报降水量级大于等于实况降水量级的概率超过75%;虽然降水预报量级上呈现出过度预报的现象,但降水过程预报对水库调度仍有较好的应用价值,应用时要考虑到降水预报量级可能存在偏差.3)转折性天气预报96 h及以上预见期CTS评分较低,但72 h以内预见期的性能明显改进,尤其是24 h预见期CTS评分也提高到了38.2%;水库调度可从长预见期的降水预报获取降水过程及其可能发生转折的信息,根据短预见期的降水预报进行调度方案调整.  相似文献   

9.
Probabilistic-fuzzy health risk modeling   总被引:3,自引:2,他引:1  
Health risk analysis of multi-pathway exposure to contaminated water involves the use of mechanistic models that include many uncertain and highly variable parameters. Currently, the uncertainties in these models are treated using statistical approaches. However, not all uncertainties in data or model parameters are due to randomness. Other sources of imprecision that may lead to uncertainty include scarce or incomplete data, measurement error, data obtained from expert judgment, or subjective interpretation of available information. These kinds of uncertainties and also the non-random uncertainty cannot be treated solely by statistical methods. In this paper we propose the use of fuzzy set theory together with probability theory to incorporate uncertainties into the health risk analysis. We identify this approach as probabilistic-fuzzy risk assessment (PFRA). Based on the form of available information, fuzzy set theory, probability theory, or a combination of both can be used to incorporate parameter uncertainty and variability into mechanistic risk assessment models. In this study, tap water concentration is used as the source of contamination in the human exposure model. Ingestion, inhalation and dermal contact are considered as multiple exposure pathways. The tap water concentration of the contaminant and cancer potency factors for ingestion, inhalation and dermal contact are treated as fuzzy variables while the remaining model parameters are treated using probability density functions. Combined utilization of fuzzy and random variables produces membership functions of risk to individuals at different fractiles of risk as well as probability distributions of risk for various alpha-cut levels of the membership function. The proposed method provides a robust approach in evaluating human health risk to exposure when there is both uncertainty and variability in model parameters. PFRA allows utilization of certain types of information which have not been used directly in existing risk assessment methods.  相似文献   

10.
Providing reliable and accurate storm surge forecasts is important for a wide range of problems related to coastal environments. In order to adequately support decision-making processes, it also become increasingly important to be able to estimate the uncertainty associated with the storm surge forecast. The procedure commonly adopted to do this uses the results of a hydrodynamic model forced by a set of different meteorological forecasts; however, this approach requires a considerable, if not prohibitive, computational cost for real-time application. In the present paper we present two simplified methods for estimating the uncertainty affecting storm surge prediction with moderate computational effort. In the first approach we use a computationally fast, statistical tidal model instead of a hydrodynamic numerical model to estimate storm surge uncertainty. The second approach is based on the observation that the uncertainty in the sea level forecast mainly stems from the uncertainty affecting the meteorological fields; this has led to the idea to estimate forecast uncertainty via a linear combination of suitable meteorological variances, directly extracted from the meteorological fields. The proposed methods were applied to estimate the uncertainty in the storm surge forecast in the Venice Lagoon. The results clearly show that the uncertainty estimated through a linear combination of suitable meteorological variances nicely matches the one obtained using the deterministic approach and overcomes some intrinsic limitations in the use of a statistical tidal model.  相似文献   

11.
In a water‐stressed region, such as the western United States, it is essential to have long lead times for streamflow forecasts used in reservoir operations and water resources management. Current water supply forecasts provide a 3‐month to 6‐month lead time, depending on the time of year. However, there is a growing demand from stakeholders to have forecasts that run lead times of 1 year or more. In this study, a data‐driven model, the support vector machine (SVM) based on the statistical learning theory, was used to predict annual streamflow volume with a 1‐year lead time. Annual average oceanic–atmospheric indices consisting of the Pacific decadal oscillation, North Atlantic oscillation (NAO), Atlantic multidecadal oscillation, El Niño southern oscillation (ENSO), and a new sea surface temperature (SST) data set for the ‘Hondo’ region for the period of 1906–2006 were used to generate annual streamflow volumes for multiple sites in the Gunnison River Basin and San Juan River Basin, both located in the Upper Colorado River Basin. Based on the performance measures, the model showed very good forecasts, and the forecasts were in good agreement with measured streamflow volumes. Inclusion of SST information from the Hondo region improved the model's forecasting ability; in addition, the combination of NAO and Hondo region SST data resulted in the best streamflow forecasts for a 1‐year lead time. The results of the SVM model were found to be better than the feed‐forward, back propagation artificial neural network and multiple linear regression. The results from this study have the potential of providing useful information for the planning and management of water resources within these basins. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

12.
A review of advances in flash flood forecasting   总被引:1,自引:0,他引:1  
Flash flooding is one of the most hazardous natural events, and it is frequently responsible for loss of life and severe damage to infrastructure and the environment. Research into the use of new modelling techniques and data types in flash flood forecasting has increased over the past decade, and this paper presents a review of recent advances that have emerged from this research. In particular, we focus on the use of quantitative precipitation estimates and forecasts, the use of remotely sensed data in hydrological modelling, developments in forecasting models and techniques, and uncertainty estimates. Over the past decade flash flood forecast lead‐time has expanded up to six hours due to improved rainfall forecasts. However the largest source of uncertainty of flash flood forecasts remains unknown future precipitation. An increased number of physically based hydrological models have been developed and used for flash flood forecasting and they have been found to give more plausible results when compared with the results of conceptual, statistical, and neural network models. Among the three methods for deciding flash flood occurrence discussed in this review, the rainfall comparison method (flash flood guidance) is most commonly used for flash flood forecasting as it is easily understood by the general public. Unfortunately, no existing model is capable of making reliable flash flood forecasts in urban watersheds even though the incidence of urban flash flooding is increasing due to increasing urbanisation. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

13.
A procedure for short-term rainfall forecasting in real-time is developed and a study of the role of sampling on forecast ability is conducted. Ground level rainfall fields are forecasted using a stochastic space-time rainfall model in state-space form. Updating of the rainfall field in real-time is accomplished using a distributed parameter Kalman filter to optimally combine measurement information and forecast model estimates. The influence of sampling density on forecast accuracy is evaluated using a series of a simulated rainfall events generated with the same stochastic rainfall model. Sampling was conducted at five different network spatial densities. The results quantify the influence of sampling network density on real-time rainfall field forecasting. Statistical analyses of the rainfall field residuals illustrate improvement in one hour lead time forecasts at higher measurement densities.  相似文献   

14.
《水文科学杂志》2012,57(15):1932-1942
ABSTRACT

The UK Hydrological Outlook (UKHO) is a seasonal forecast of future river flows and groundwater levels. The UKHO contains both presentations of outputs from models simulating future conditions and a high-level summary. The summary is produced by an expert panel of forecasters that considers the model outputs together with other recent hydrological and meteorological information. Whilst the skill and uncertainty of the individual models have been explored and published, this study sets out to establish the performance of the high-level summary, and presents such an assessment of the river flow forecasts at the 1-month timescale. Both qualitative and quantitative assessments are presented and compared with two naïve forecasting methods. The UKHO summary is found to have a similar Gerrity skill score to a “same as last month” forecast, an outcome that generates suggestions for improvements in how the different model outputs should be considered and presented in the high-level summary.  相似文献   

15.
From the suite of future Global Precipitation Mission (GPM) satellites we have selected 11 of the possible contributors to the NASA’s International precipitation measurement program. The Observing System Simulation Experiments (OSSE) presented here explores the predictive usefulness of this suite of satellites. In order to carry out such experiments a Nature Run based on results from a state of the model is required. For that purpose we have selected recent past runs from the European Center for Medium Range Forecasts (ECMWF). These were designated as special data sets for OSSEs in partnership between NASA, NCEP/EMC, and NOAA. In order to test the usefulness of these future GPM-based precipitation measurements we first identify the typical orbits of eleven satellites. Along these orbital tracks we generate proxy precipitation data sets from the ECMWF Nature Run. This method of extraction of precipitation data set from a Nature Run is described in this paper. This methodology also requires a fraternal twin model (different from the Nature Run) in which the usefulness of the proposed GPM proxy data sets from the Nature Run are systematically evaluated in a forecast mode. The procedure for incorporation of the rainfall data sets is called the rain rate initialization. Data from one or more satellites are sequentially introduced into the fraternal twin model (which is the Florida State University Global Spectral Model) during the initialization phase for a number of experiments. After the initialization of such precipitation data sets, forecast experiments are carried out with the fraternal twin. The question asked is, as we introduce more and more GPM satellites how close do the forecasts from the fraternal twin approach the Nature Run? The results from this experimentation show that very promising improvements for short-range precipitation forecast skills are attainable from the proposed suite of GPM satellites.  相似文献   

16.
Short-term water system operation can be realized using Model Predictive Control (MPC). MPC is a method for operational management of complex dynamic systems. Applied to open water systems, MPC provides integrated, optimal, and proactive management, when forecasts are available. Notwithstanding these properties, if forecast uncertainty is not properly taken into account, the system performance can critically deteriorate.Ensemble forecast is a way to represent short-term forecast uncertainty. An ensemble forecast is a set of possible future trajectories of a meteorological or hydrological system. The growing ensemble forecasts’ availability and accuracy raises the question on how to use them for operational management.The theoretical innovation presented here is the use of ensemble forecasts for optimal operation. Specifically, we introduce a tree based approach. We called the new method Tree-Based Model Predictive Control (TB-MPC). In TB-MPC, a tree is used to set up a Multistage Stochastic Programming, which finds a different optimal strategy for each branch and enhances the adaptivity to forecast uncertainty. Adaptivity reduces the sensitivity to wrong forecasts and improves the operational performance.TB-MPC is applied to the operational management of Salto Grande reservoir, located at the border between Argentina and Uruguay, and compared to other methods.  相似文献   

17.
A Monte Carlo-based approach to assess uncertainty in recharge areas shows that incorporation of atmospheric tracer observations (in this case, tritium concentration) and prior information on model parameters leads to more precise predictions of recharge areas. Variance-covariance matrices, from model calibration and calculation of sensitivities, were used to generate parameter sets that account for parameter correlation and uncertainty. Constraining parameter sets to those that met acceptance criteria, which included a standard error criterion, did not appear to bias model results. Although the addition of atmospheric tracer observations and prior information produced similar changes in the extent of predicted recharge areas, prior information had the effect of increasing probabilities within the recharge area to a greater extent than atmospheric tracer observations. Uncertainty in the recharge area propagates into predictions that directly affect water quality, such as land cover in the recharge area associated with a well and the residence time associated with the well. Assessments of well vulnerability that depend on these factors should include an assessment of model parameter uncertainty. A formal simulation of parameter uncertainty can be used to delineate probabilistic recharge areas, and the results can be expressed in ways that can be useful to water-resource managers. Although no one model is the correct model, the results of multiple models can be evaluated in terms of the decision being made and the probability of a given outcome from each model.  相似文献   

18.
Hydrological and statistical models are playing an increasing role in hydrological forecasting, particularly for river basins with data of different temporal scales. In this study, statistical models, e.g. artificial neural networks, adaptive network-based fuzzy inference system, genetic programming, least squares support vector machine, multiple linear regression, were developed, based on parametric optimization methods such as particle swarm optimization (PSO), genetic algorithm (GA), and data-preprocessing techniques such as wavelet decomposition (WD) for river flow modelling using daily streamflow data from four hydrological stations for a period of 1954–2009. These models were used for 1-, 3- and 5-day streamflow forecasting and the better model was used for uncertainty evaluation using bootstrap resampling method. Meanwhile, a simple conceptual hydrological model GR4J was used to evaluate parametric uncertainty based on generalized likelihood uncertainty estimation method. Results indicated that: (1) GA and PSO did not help improve the forecast performance of the model. However, the hybrid model with WD significantly improved the forecast performance; (2) the hybrid model with WD as a data preprocessing procedure can clarify hydrological effects of water reservoirs and can capture peak high/low flow changes; (3) Forecast accuracy of data-driven models is significantly influenced by the availability of streamflow data. More human interferences from the upper to the lower East River basin can help to introduce greater uncertainty in streamflow forecasts; (4) The structure of GR4J may introduce larger parametric uncertainty at the Longchuan station than at the Boluo station in the East river basin. This study provides a theoretical background for data-driven model-based streamflow forecasting and a comprehensive view about data and parametric uncertainty in data-scarce river basins.  相似文献   

19.
A statistical post-processing methodology for application to numerical weather prediction (NWP) model outputs for precipitation forecast is proposed. The post-processing is based on the model output statistics approach. The statistical relationships are described by the multiple linear regression model, which is complemented by an iteration procedure to further correct the regression outputs. Prognostic fields of the ALADIN/LACE (Aire Limitée Adaptation Dynamique Développement InterNational/Limited Area Modelling in Central Europe) NWP model are used for the forecast of 6-hourly areal precipitation amounts at 15 river basins. The NWP model integration starts at 00UTC and forecasts are calculated for lead times of +12, +18, +24 and +30 hours. The post-processing models are developed separately for each lead time and for separate warm (April to September) and cool (October to March) seasons. The forecasts are focused on large precipitation amounts. Using all the combinations, data from four years (1999–2002) are divided into calibration data (3 years), where the models are developed, and verification data. The models are evaluated by examining the root-mean-square error (RMSE), bias, and correlation coefficient (CC) on the verification data samples. The results show that the additional iteration procedure increases the forecast accuracy for a given range of precipitation amounts and simultaneously does not deteriorate the bias, a situation which can arise when negative regression outputs are set to zero. The post-processing method improves the forecast of the NWP model in terms of RMSE and CC. For large precipitation amounts during the summer season, the decrease of RMSE reaches 10% to 20% depending upon the applied method of verification. For the cool season, the decrease is somewhat smaller (7% to 15%).  相似文献   

20.
Nowadays, Flood Forecasting and Warning Systems (FFWSs) are known as the most inexpensive and efficient non‐structural measures for flood damage mitigation in the world. Benefit to cost of the FFWSs has been reported to be several times of other flood mitigation measures. Beside these advantages, uncertainty in flood predictions is a subject that may affect FFWS's reliability and the benefits of these systems. Determining the reliability of advanced flood warning systems based on the rainfall–runoff models is a challenge in assessment of the FFWS performance which is the subject of this study. In this paper, a stochastic methodology is proposed to provide the uncertainty band of the rainfall–runoff model and to calculate the probability of acceptable forecasts. The proposed method is based on Monte Carlo simulation and multivariate analysis of the predicted time and discharge error data sets. For this purpose, after the calibration of the rainfall–runoff model, the probability distributions of input calibration parameters and uncertainty band of the model are estimated through the Bayesian inference. Then, data sets of the time and discharge errors are calculated using the Monte Carlo simulation, and the probability of acceptable model forecasts is calculated by multivariate analysis of data using copula functions. The proposed approach was applied for a small watershed in Iran as a case study. The results showed using rainfall–runoff modeling based on real‐time precipitation is not enough to attain high performance for FFWSs in small watersheds, and it seems using weather forecasts as the inputs of rainfall–runoff models is essential to increase lead times and the reliability of FFWSs in small watersheds. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号