首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到16条相似文献,搜索用时 187 毫秒
1.
以武汉长江隧道工程为背景,采用盾构隧道-地层复合体模拟试验系统和旋转式水压装置共同作用,完成了在不同水土压力场作用下的管片衬砌结构力学特征相似模型试验,最后对盾构隧道管片衬砌结构的静力学行为特征的试验结果进行了重点分析。分析表明,9等分块力学性能优于9+1分块;宜将错缝180°的错缝拼装方式作为武汉工程首选拼装方案;对于大幅宽管片,幅宽中央受环间螺栓剪力影响较小,而幅宽边缘则较大。  相似文献   

2.
盾构机在沿曲线掘进或轴线纠偏过程中,盾尾非对称推力会在管片端部产生附加弯矩,从而引起隧道发生纵向变形。现有解析方法多是将盾构隧道简化为等效连续梁,不能考虑隧道管片环间接头的弱化。首先,建立一种能够同时考虑环间张开和剪切错台的简化纵向梁-弹簧盾构隧道模型(simplified longitudinal beam-spring shield tunnel model,简称SLBSM);其次,将在建隧道简化为Winkler地基上的SLBSM,采用状态空间法推导了非对称推力作用下盾构隧道纵向变形解析解答。通过与既有文献有限元及现有两种连续梁模型计算结果进行对比,验证了所提方法的可靠性和适用性,并对部分参数进行敏感性分析。研究结果表明:连续梁模型计算得到的隧道纵向位移表现为连续特征,而所提方法得到的隧道纵向位移表现为非连续特征,隧道纵向位移在接头处会发生突变;通过参数分析可知:增大接头转动刚度可有效降低隧道隆起和环间张开量;增大接头剪切刚度可有效降低环间错台量,但会导致隧道隆起和剪力的增加;增大地基刚度能显著降低隧道环间张开量和隆起,但会导致环间错台量的增加;管片始端轴力对隧道纵向变形的影响不可...  相似文献   

3.
考虑接头力学特性的盾构隧道衬砌结构计算方法研究   总被引:4,自引:0,他引:4  
张冬梅  樊振宇  黄宏伟 《岩土力学》2010,31(8):2546-2552
基于盾构隧道衬砌结构接头的构造特征,建立了接头的力学模型,将接头位置管片间的相互作用离散为一系列由剪切弹簧和法向弹簧组成的组合弹簧,根据得到的节点弹簧应力或法向位移在计算过程中动态调整弹簧刚度参数,将接头模型应用到衬砌结构计算中。该方法可以综合考虑衬砌结构的横向和纵向结构性能,计算管片和接头的内力与变形以及接缝的张开量。采用上海长江隧道衬砌结构整环试验结果对计算模型进行了验证,结果表明该模型能比较合理地模拟衬砌结构的变形特性。  相似文献   

4.
盾构衬砌管片环弯曲等效刚度的一种确定方法   总被引:6,自引:0,他引:6  
钟小春  朱伟  季亚平  徐洋 《地质与勘探》2003,39(Z2):185-189
文章根据修正惯用法和梁-弹簧模型法定性分析了由钢螺栓接头拼装而成的盾构衬砌管片环弯曲等效刚度的主要影响因素,并给出了目前我国盾构衬砌环的弯曲刚度的有效率η的一个拟合公式,公式的正确性通过模型试验的验证,有一定工程参考价值.  相似文献   

5.
盾构隧道衬砌结构受力分析的梁—弹簧系统模型   总被引:44,自引:6,他引:38  
盾构隧道衬砌结构由若干管片及其间的连接螺栓组成。在其断面受力的工程设计中,目前普遍采用梁-弹簧系统模型来模拟其受力性态。其中,梁可分成直梁和曲梁两类。本文在考虑弹簧刚度的轴向、切向和转动效应的同时,从卡氏(Castigliano)第二定理出发,给出了梁-弹簧模型的矩阵式,并论证了直梁-弹簧模型与曲梁-弹簧模型的一致性关系。在数值模拟计算过程中,还考虑了地层反作用力非线性情形和管片接头转动刚度正、负弯矩时的非对称性问题。  相似文献   

6.
基坑卸荷将对下卧既有隧道产生附加荷载。结合工程实际,提出考虑隧道剪切效应及埋深效应的基坑开挖下卧隧道形变响应的半解析解。引入能考虑隧道埋深的修正基床反力系数,再由Mindlin解给出基坑卸荷对下卧隧道产生的附加荷载。视既有隧道为埋置于Pasternak地基上的Timoshenko梁,将附加荷载施加于隧道并计算其响应,提出可考虑隧道埋深及剪切效应的下卧隧道在基坑卸荷下的响应解。与三维有限元数值模拟、杭州地铁一号线九寨河基坑的测量结果的对比,验证了所提方法的准确性。针对隧道等效抗弯刚度、等效剪切刚度对隧道内力及变形的影响进行系统的敏感性分析。结果表明,采用Timoshenko梁模拟隧道可更好地分析隧道的力学响应;当提高隧道抗弯刚度,隧道的位移值、弯矩值和剪力值会显著下降,但其分布范围会增大;隧道最大正弯矩及最大剪力所在位置保持不变,不受隧道抗弯刚度值的影响,但最大负弯矩所在位置会随抗弯刚度的增大向隧道两端移动,当隧道剪切刚度超过抗弯刚度的20%时隧道位移、弯矩、剪力几乎均不再受剪切刚度的影响。所得结论可为类似工程提供一定理论支持。  相似文献   

7.
基坑卸荷将对下卧既有隧道产生附加荷载。结合工程实际,提出考虑隧道剪切效应及埋深效应的基坑开挖下卧隧道形变响应的半解析解。引入能考虑隧道埋深的修正基床反力系数,再由Mindlin解给出基坑卸荷对下卧隧道产生的附加荷载。视既有隧道为埋置于Pasternak地基上的Timoshenko梁,将附加荷载施加于隧道并计算其响应,提出可考虑隧道埋深及剪切效应的下卧隧道在基坑卸荷下的响应解。与三维有限元数值模拟、杭州地铁一号线九寨河基坑的测量结果的对比,验证了所提方法的准确性。针对隧道等效抗弯刚度、等效剪切刚度对隧道内力及变形的影响进行系统的敏感性分析。结果表明,采用Timoshenko梁模拟隧道可更好地分析隧道的力学响应;当提高隧道抗弯刚度,隧道的位移值、弯矩值和剪力值会显著下降,但其分布范围会增大;隧道最大正弯矩及最大剪力所在位置保持不变,不受隧道抗弯刚度值的影响,但最大负弯矩所在位置会随抗弯刚度的增大向隧道两端移动,当隧道剪切刚度超过抗弯刚度的20%时隧道位移、弯矩、剪力几乎均不再受剪切刚度的影响。所得结论可为类似工程提供一定理论支持。  相似文献   

8.
盾构衬砌管片接头力学分析及双直线刚度模型研究   总被引:8,自引:2,他引:6  
朱伟  钟小春  秦建设 《岩土力学》2006,27(12):2154-2158
盾构管片接头弯曲刚度K? 是盾构衬砌结构计算中的一个重要参数。根据管片接头构造特征,在传力衬垫和弹性密封橡胶试验资料的基础上,对管片接头进行受力分析,得到管片接头弯曲刚度与接头内力的非线性关系。为了应用方便,建立了实用的管片接头弯曲刚度的双直线模型。该接头刚度模型为梁-弹簧模型法和修正惯用法中的关键参数确定提供了基础,管片的内力计算也更加合理。  相似文献   

9.
湛江湾隧道是目前国内最深的跨海盾构隧道,其管片采用斜螺栓连接,错缝拼装,分别采用修正惯用法及梁-弹簧法计算最大覆土断面与最大水深断面管片的受力,并将实测管片受力、水-土压力值与理论计算结果进行比较,分析水-土压力分布模式,结果表明,修正惯用法与梁-弹簧法均可以较好地模拟隧道管片的受力形态,而梁-弹簧法比修正惯用法更接近实测结果;管片呈压扁状态,梁-弹簧法结果受封顶块的位置影响较大;太沙基松弛土压力及水-土压力线性分布模式对深埋海底隧道是适用和安全的;对于本工程来说,管片外荷载以径向水压力为主,是影响管片轴力的主要因素。以上成果可为今后跨海高水头盾构隧道管片的设计及施工提供参考。  相似文献   

10.
盾构隧道管片衬砌的平板壳-弹性铰-地基系统模型   总被引:8,自引:3,他引:5  
胡志平  罗丽娟  蔡志勇 《岩土力学》2005,26(9):1403-1408
从Reissner-Mindlin板单元入手,研究了盾构隧道管片衬砌结构之间的连接特征及土层与管片衬砌结构的共同作用,提出了盾构隧道管片衬砌结构的平板壳-弹性铰-地基系统模型,在此基础上研制了相应的有限元计算程序。该模型考虑了管片衬砌本身的弯曲、剪切和薄膜作用,考虑了纵向接缝在正负弯矩作用下的转动刚度差异和环向结缝对结构刚度的削弱作用,以及土层与衬砌结构的共同作用。能解决盾构隧道管片衬砌结构的三维受力分析,并能计算出结构的内力和变形,弥补了二维计算模型的某些不足。验证了程序的可靠性,最后给出了工程算例的三维计算分析结果。  相似文献   

11.
盾构法隧道在国内的应用越来越广泛,早期建造的盾构隧道在工后沉降较大时出现较大的纵向变形问题,考虑隧道结构特征的设计模型及其刚度计算逐渐得到重视。在考虑管片螺栓等结构特征基础上,建立可考虑环缝张开的三维纵向结构计算模型。研究结果表明,与管片环接缝相关的影响因素,如螺栓的数量、螺栓的预紧力以及管片环宽度对纵向弯曲刚度有效率影响较大,随着纵向螺栓数量和管片环宽度的增加而线性增加,随着螺栓预紧力的增加而非线性快速增加,而管片环的横向弯曲刚度有效率影响较小。研究成果为盾构隧道纵向设计提供了关键参数。  相似文献   

12.
This paper presents the results of a numerical study that has been performed to investigate the different joint types that affect the moment-rotation relation and ultimate bending moment capacity of a joint. A 3D finite element method was adapted to establish elaborate numerical models of segments. To evaluate the possible differences in moment-rotation behavior between different joint types, 10 different joint types were simulated. Additionally, the effect of different joint types on behavior of a lining ring was investigated. The validity of the peridynamic simulation was tested by comparing results obtained in this paper against the results obtained in a study performed by Hordijk and Gijsbers. Observations of the results demonstrate that in a flat joint, the expanding of joint height increased the rotation stiffness of the joint in the linear branch, and accordingly, the ultimate bending moment of the joint increased. In the ring model, it was observed that the expanding of joint height led to the decreased of ring displacement and stress concentration in the joint. Whenever there were full surface contacts (contact two segment in total cross section) in the joints, the rotation stiffness of the joints in the linear branch became equal, and, as a result, the displacement in the ring model was the same in all joint types. In addition, it was observed that using a convex joint in the ring model increases the displacement of the ring. The ultimate bending moment of bolted joints was higher than that of joints without bolts, especially in the case of a negative moment.  相似文献   

13.
通过对比修正惯用法的解析解、ANSYS数值模拟解和ANSYS梁-弹簧模型法数值模拟解,结合东莞至惠州城际轨道交通工程DK97+898.238~DK100+897段管片内力现场实测结果,深入探讨各计算方法的合理性和准确性,并得出以下结论:修正惯用法解析解管片内力及配筋最大,修正惯用法数值解次之,梁-弹簧法数值解与现场实测反算值最小。修正惯用法解析解偏保守,容易造成设计配筋过大和浪费;建模较为复杂的梁-弹簧法及现场实测可反馈设计,其结果表明,修正惯用法数值模拟结果比解析解更接近工程实际,本工程内比解析法可节省配筋22.6%左右,且仍有富余量。  相似文献   

14.
王磊  过超  穆保岗  龚维明  孙振威 《岩土力学》2015,36(11):3150-3156
以琼州海峡跨海大桥工程为背景,通过4组不同型式深水桥梁基础模型试验,对新型带桩沉箱复合基础的水平向承载性能进行了初步研究。试验得到了4组模型在砂性土层中的Q-s曲线及水平向极限承载力,并对复合基础在各级水平荷载下的桩身弯矩和剪力进行了详细分析,同时对沉箱-桩荷载分担比展开了讨论。试验结果表明:当增加裙边、钢管桩、或同时增加钢管桩和裙边后能够使单体沉箱基础的水平向极限承载力分别提高1.2倍、1.6倍和2.0倍;桩身最大弯矩点均出现在桩身中部即泥面下约0.5 m处。水平荷载主要由上部沉箱基础及桩身中上部土体承担,钢管桩桩顶与沉箱连接部位出现最大剪力,在实际工程中应在此处采取加固措施。研究成果可为这一新型深水桥梁基础的推广应用提供诸多有益参考。  相似文献   

15.
In this study, four groups of different types of bridge foundation model are tested to research the horizontal bearing behavior of caisson-pile composite foundation in lab based on the Qiongzhou Strait bridge project. The Q-s curve and horizontal ultimate bearing capacity of these four groups of foundations in sandy soil layer are obtained. Pile bending moment and shear force of pile shaft are analyzed in detail. At the same time, the load sharing ratio of caisson and piles is discussed. The results show that the horizontal ultimate bearing capacities of a single caisson foundation are increased by 1.2 times, 1.6 times and 2 times respectively with adding skirts, steel pipe pile, or steel pipe pile and the skirt. The maximum bending moment point is in the middle of the pile shaft, i.e. at about 0.5 m under the mud surface. The horizontal load is borne mainly by the upper caisson foundation and soil layers above the middle upper part of pile. The maximum shear force is found at the joint of pile top of steel pipe and caisson pile, where the reinforcement measures should be taken in practical engineering. The research achievements could provide a better reference for design or construction of caisson-pile composite foundation.  相似文献   

16.
顶管施工对邻近地下管线的影响预测分析   总被引:3,自引:0,他引:3  
魏纲  朱奎 《岩土力学》2009,30(3):825-831
采用通用Peck公式计算顶管施工引起的地下管线平面处的土体竖向位移。对地下管线的受力模型进行简化,基于Winkler地基模型,得到地下管线由于顶管开挖引起的极限弯矩、理论弯矩以及管线变形的计算方法。通过算例分析,与连续弹性解、Attewell解和王涛解的计算结果进行比较,探讨了土质条件、管线材质、管线埋深、管线管径对地下管线受力的影响。计算结果表明,本方法适用于各种土质,可较好地预估管线所受弯矩,且不会低估管线所受的最大弯矩;在相同条件下,管线埋深越大承受的弯矩也越大,但埋深仅对最大正弯矩和最大负弯矩位置附近处的管线影响较大,对其余部位影响较小;管线抗弯刚度越大,管线承受的极限弯矩和影响范围也越大;管线管径越大,管线承受的弯矩也越大。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号