首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Anomalous information identification is a key issue for seismic hazard prevention in underground mining. Velocity tomograms can image the stress redistribution around coal face and provide better understanding of strata failure mechanisms. In this paper, based on microseismic events recorded during mining operation, passive tomographic imagings have been presented to assess strong tremor hazard and locate high seismic activity zones around an island coal face under super-thick strata. The zones of high velocity or velocity gradient anomalies have been found to correlate well with the distribution of strong tremors, indicating that velocity tomography is feasible for seismic hazard assessment and risk region division in underground mining.  相似文献   

2.

Equipment recovery passage (ERP) is being widely employed in longwall panel for the purpose of recovering heave mining equipment at the end of mining stage. The stability of the ERP, however, is always difficult to control although powerful supporting structures are employed, which restricts its further promotion. In the present paper, we focused on the ERP’s stability control through reducing the abutment stress imposed on the ERP’s surroundings rather than solely increasing roadway support intensity, based on a rigorous case study in China. First, the dynamic evolution of the abutment stresses, corresponding plastic zone and deformations in the surrounding rock of the ERP were analyzed through a meticulously validated FLAC3D numerical simulation, as the longwall face moved with different velocity. The simulated results indicate that the faster the longwall face moved, the lower the abutment stresses, the narrower the plastic zone and the smaller the deformations were. In terms of these analyses, two suggestions were proposed, including increasing longwall face moving velocity and roof structure optimization, and corresponding technologies were introduced, and potential effect were verified as well. Conclusions and suggestions of this paper might be helpful for increasing the flexibility of the ERP in similar geotechnical conditions.

  相似文献   

3.
This study presents a numerical investigation on the dynamic mechanical state of a coal pillar and the assessment of the coal bump risk during extraction using the longwall mining method. The present research indicates that there is an intact core, even when the peak pillar strength has been exceeded under uniaxial compression. This central portion of the coal pillar plays a significant role in its loading capacity. In this study, the intact core of the coal pillar is defined as an elastic core. Based on the geological conditions of a typical longwall panel from the Tangshan coal mine in the City of Tangshan, China, a numerical fast Lagrangian analysis of continua in three dimensions (FLAC3D) model was created to understand the relationship between the volume of the elastic core in a coal pillar and the vertical stress, which is considered to be an important precursor to the development of a coal bump. The numerical results suggest that, the wider the coal pillar, the greater the volume of the elastic core. Therefore, a coal pillar with large width may form a large elastic core as the panel is mined, and the vertical stress is expected to be greater in magnitude. Because of the high stresses and the associated stored elastic energy, the risk of coal bumps in a coal pillar with large width is greater than for a coal pillar with small width. The results of the model also predict that the peak abutment stress occurs near the intersection between the mining face and the roadways at a distance of 7.5 m from the mining face. It is revealed that the bump-prone zones around the longwall panel are within 7–10 m ahead of the mining face and near the edge of the roadway during panel extraction.  相似文献   

4.
Most coal mines in China use the longwall mining system. High stresses are frequently encountered around development entries at deep mines. This paper presents an alternate longwall mining layout for thick coal seams to minimize ground control problems. In a conventional longwall panel layout, development entries on both ends of the panel are located along the floor, and a coal pillar (chain pillar) is left between adjacent panels to ensure stability. Gateroads on either end of a longwall panel using the layout proposed in this paper are located at different vertical levels within a thick coal seam or in a geologically split coal seam for improved stability. The headgate entry/ies are driven along the floor while the tailgate entry/ies are driven along the roof. Therefore, a longwall face has a gradually elevated or curved section on one end of the panel. For the adjacent panel, the development entry may be located directly below the development entry of the previous panel or may be offset horizontally with respect to it. Based on physical and numerical modeling approaches, it is demonstrated that the stress environment for development entries employing the longwall layout is significantly improved; ground control problems are therefore minimized.  相似文献   

5.

Gas well drilled through longwall mining abutment pillar could potentially face instability issue due to the strata deformation following longwall panel extraction. Therefore, it is imperative to adequately design the pillar size of a longwall mining in order to ensure the stability of the gas well penetrated longwall mining abutment pillar. In this paper, the determination of suitable pillar size for protecting gas well subjected to longwall mining operation was investigated. Two scenarios of longwall gateroad system including the three and four entry system with varying pillar sizes were assessed using numerical modelling approach. The results of this study indicate that the pillar geometry plays an important role on the vertical gas well stability. In addressing the suitable pillar size for the given case study considering three entry system, the suitable chain pillar and abutment pillar size were found to be 80 ft (24.4 m) wide by 120 ft (36.6 m) length and 104 ft (31.7 m) wide by 120 ft (36.6 m) length rib to rib, respectively. Whereas, if four entry system is used, the suitable chain pillar size is 48 ft (14.6) wide by 120 ft (36.6 m) length and the abutment pillar size is 104 ft (31.7 m) wide by 120 ft (36.6 m) length rib to rib. The proposed numerical modelling procedure presented in this paper can be a viable alternative and applied to other similar projects in order to determine an optimal pillar size for protecting gas well in longwall mining area.

  相似文献   

6.
镇城底矿工作面的回采巷道一条沿顶板掘进,一条沿底板掘进,相邻两工作面在端头搭接,沿底板掘进的巷道形成巷顶沿空掘巷。通过理论分析、相似模拟、数值模拟及现场实测对巷顶沿空掘巷围岩结构及应力环境进行了研究。得到如下结论:该巷道不受超前和固定支承压力影响,大结构下方的矸石垫层可起到能量和应力耗散的作用,避免了动载和冲击影响,应力低且稳定;岩层移动形成的垮落角对采空区应力大小和分布(尤其采空区边缘)有重要影响;垮落角越小,采空区应力越小,该巷道围岩应力越小,采空区恢复至原岩应力的距离越大;垮落角对岩体塑性区发育方向起控制和导向作用;该巷道围岩应力大幅低于原岩应力,卸压程度大;实测该巷道竖向和横向位移均比非沿空巷道小,即顶底板和两帮应力环境均得到改善。研究对维护具有冲击倾向的高应力巷道具有一定意义。  相似文献   

7.
不同岩性顶板回采工作面矿压分布规律   总被引:4,自引:0,他引:4  
采用数值模拟技术和现场矿压观测系统,研究了不同岩性顶板回采工作面矿压分布规律及其显现特征。结果表明,在煤炭开采过程中,不同岩性顶板回采工作面最大支承应力存在一定差异,在强度较高的砂岩顶板岩体中,支承压力大,工作面前方支承压力峰值距工作面距离小,初次来压步距和周期来压步距大,矿压显现强烈;而在强度较低的泥岩顶板区,顶板岩体不能和砂岩骨架层一样抵抗覆岩压力,且支承压力小,支承压力的峰值向回采工作面前方岩体内部推移,初次来压步距和周期来压步距小,矿压显现不明显。   相似文献   

8.
Seismic-potential for the Andaman Arc System (AAS) is evaluated using a three-tier approach: (i) the seismic b-values derived using a revised and homogenized earthquake catalog for Mw ≥ 4.7, with uniform Mw, for the period 1964–2013 created from ISC Data, (ii) Free-air gravity-anomalies for AAS and their geologic interpretation and (iii) deep crustal structure from seismic reflection surveys and 3D seismic tomography results. Both long-term spatial b-value anomalies for the period 1964-2013 and temporal b-value anomalies for a shorter period (2002–2013) have been estimated. The b-value maps are interpreted in terms of the stress regime acting across AAS and stressed asperities inferred along the strike of AAS. Eight distinguishable seismic-zones are identified and their seismic potential is examined by temporal bvalue anomalies in producing moderate to large earthquakes. The latter demonstrates ‘low-high’ or ‘high-low’ couplet over years, and that a variation in b-value more than 20% compared to the previous year value is likely to produce an earthquake event with Mw ≥ 6.0. Some support to this interpretation comes from the regional Free-air gravity-anomalies and deep crustal structure interpreted from hypocentral distribution of earthquakes. The high b-values are seemingly associated with magma chambers or low velocity crust; creating asperity zones due to multiple batholithic intrusions at plate boundary. This geologic interpretation is evidenced by 3D P-wave seismic tomography and velocity heterogeneity study for AAS reported by us elsewhere.  相似文献   

9.
This paper describes seismic velocity tomography applied to the investigation and assessment of karst collapse hazards to facilitate accurate characterization of geological conditions of karst sinkhole formation. In the survey areas of Xiamao, Guangzhou, China, and Huangchi, Foshan, China, seismic velocity tomography was used to explore the structures of rock and soil associated with karst collapse. The results show that sand intercalated with clay or clay intercalated with soft soil dominates the cover of these two areas. The overburden is 20–33 m thick and underlain by Carboniferous limestone. In the limestone, there are well-developed karst caves and cracks as well as highly fluctuating bedrock surfaces. The seismic velocities are less than 2500 m/s in the cover, 2500–4500 m/s in the karst fracture zones and caves of Xiamao, and 1500–2000 m/s in the Huangchi collapse area. The karst fracture zones, relief of bedrock surfaces, and variations of soil thicknesses revealed by seismic velocity tomography are well constrained and in agreement with those in the drilling borehole profiles. This paper demonstrates that seismic velocity tomography can delineate anomalies of rock and soil with the advantages of speed, intuitive images, and high resolution.  相似文献   

10.
The paper discusses the concept and methodologies for the development of longwall face stability index (LFSI). LFSI is used for estimation of chock-shield pressure and face convergence. The index comprises of engineering properties of main roof, depth of mining, different support capacities and mechanical properties of coal seam being mined and provides a numerical value in the range of −6.17 to 8.13. In this study, 324 finite element models of longwall panel are developed based on various combinations of geomining conditions of Indian coal measure strata. The LFSI is an outcome of the results from finite element models. This paper illustrates a real life example for the estimation of chock shield pressure and face convergence based on LFSI. Validation of the LFSI based calculation is carried out with the field monitored data and found that the LFSI based approach is sufficient to forecast face stability parameters at longwall face.  相似文献   

11.
闫书缘  杨科  廖斌琛  涂辉 《岩土力学》2013,34(9):2551-2556
为研究深部近距离煤层群下向卸压开采高应力演化的特征,根据潘二煤矿深部近距离煤层群8煤和6煤地质与开采技术条件,设计了下向卸压开采的二维相似材料模拟试验模型,对8煤和6煤开采引起的采动应力进行监测。系统分析了8煤下向开采与6煤开采后的采场围岩采动应力、岩层运移及不规则煤柱对采动应力演化的影响,获得了近距离煤层群8煤下向卸压开采的顶底板采动高应力演化特征及6煤回采期间覆岩运移、采动应力裂隙演化和来压特征,得出了下向卸压开采不规则煤柱对采动应力、裂隙分布的影响规律。研究不仅为以采动高应力演化为主导作用的煤岩动力灾害防治提供了理论基础,也为卸压开采采场参数设计与优化提供了技术支撑。  相似文献   

12.
A dense seismic network (~100 stations) was operated in the Koyna-Warna region from January 2010 to May 2010, that allow us to collect 400 high-quality local earthquake data of magnitude less than 4. In this region, the fault structure and tectonic setting that accommodate the induced seismicity is not well understood. To investigate the seismotectonics of the region, we have inverted 7826 P- and 7047 S-P arrival times for 3-D Vp and Vp/Vs tomographic models along with hypocenters parameters in the region. Although, Dixit et al. (2014) have performed 3-D local earthquake tomography with double-difference tomography code using catalog differential time data. In this paper, Simulps14 code on the same data set is applied. For better approach P arrival time and S-P travel times are inverted directly for Vp, Vp/Vs variations and earthquake locations. High Vp ~5.9 to 6.5 and low to high Vp/Vs ~1.69-1.74 imaged in the hypocenter region. These features interpreted as a fluid bearing rock mass under high pore pressure. It is also observed that below the trap basement form a local topography depression between the Koyna and Warna Reservoirs. To the South of the Warna reservoir, intense seismic activity defines a major cluster of ~ 5 km width at 3 to7 km deep, located under the trap, where the basement is deepening. Such regions are inferred to be associated with the seismically active faults zones. The obtain velocity anomalies are reliable down to a depth of 10 km. This is also confirmed by the analysis of three resolution parameters viz. Hit count, Derivative Weight sum (DWS) and Resolution Diagonal Elements (RDE).  相似文献   

13.
Today's highly productive coal mining systems represent large capital investments. Careful geotechnical planning and design are essential to protect these systems and to help ensure their overall success. Too often, however, the ability of the mine operator to adequately characterize the geotechnical environment and keep up with changing geologic conditions lags the advance rate of the mining equipment. Seismic tomographic imaging, based on the same principles as medical Computer-Aided-Tomography (CAT) Scans, offers the ability to identify changing geologic conditions, loading patterns, and the location of nearby abandoned mine workings. Although seismic tomography has been used for many years in the oil industry, until recently its practicality in the mining industry has been limited because the processes involved interfered with mining productivity and were labor-intensive in terms of data collection and interpretation. New advancements in signal processing have greatly enhanced the speed, resolution, and range of applications of tomographic imaging in underground coal mine settings.Many tomography applications in the mining industry use seismic velocity and/or attenuation tomography within a volume enclosed by the seismic source and receiver array. Although results obtained using this geometry work well in many situations, recent developments in reflection tomography show promise in eliminating the requirement that the target volume be surrounded by sources/receivers. For example, in-seam seismic reflection tomography may now be used to image structures and/or old workings from one general location in the mine (e.g., face areas of mains and panel developments) well ahead of planned developments—largely eliminating the need to probe-hole drill on regular intervals. These new developments have greatly expanded the ability of the mine operator to cost-effectively characterize previously inaccessible areas of the property.This paper gives an overview of the theories and processes involved in seismic tomography applicable to coal mine settings. Recent examples are presented of tomographic imaging applied to a variety of coal mine ground control problems and old works detection in the United States and Europe. The applicability of both seismic refraction and seismic reflection tomography is discussed.  相似文献   

14.
Seismic measurements may be used in geostatistical techniques for estimation and simulation of petrophysical properties such as porosity. The good correlation between seismic and rock properties provides a basis for these techniques. Seismic data have a wide spatial coverage not available in log or core data. However, each seismic measurement has a characteristic response function determined by the source-receiver geometry and signal bandwidth. The image response of the seismic measurement gives a filtered version of the true velocity image. Therefore the seismic image cannot reflect exactly the true seismic velocity at all scales of spatial heterogeneities present in the Earth. The seismic response function can be approximated conveniently in the spatial spectral domain using the Born approximation. How the seismic image response affects the estimation of variogram. and spatial scales and its impact on geostatistical results is the focus of this paper. Limitations of view angles and signal bandwidth not only smooth the seismic image, increasing the variogram range, but also can introduce anisotropic spatial structures into the image. The seismic data are enhanced by better characterizing and quantifying these attributes. As an exercise, examples of seismically assisted cokriging and cosimulation of porosity between wells are presented.  相似文献   

15.
The paper presents an innovative numerical approach to simulate progressive caving of strata above a longwall coal mining panel. A proposed Trigon logic is incorporated within UDEC to successfully capture the progressive caving of strata which is characterized by fracture generation and subsequent propagation. A new damage index, D, is proposed that can quantify regions of both compressive shear and tensile failure within the modelled longwall. Many features of progressive caving are reproduced in the model and found to fit reasonably well with field observations taken from a case study in the Ruhr coalfield. The modelling study reveals that compressive shear failure, rather than tensile failure, is the dominant failure mechanism in the caved strata above the mined-out area. The immediate roof beds act like beams and can collapse in beam bending when vertical stress is dominant or in beam shear fracture when horizontal stress is dominant. The proposed numerical approach can be used to guide the design of longwall panel layout and rock support mechanisms.  相似文献   

16.
华北东部地区地壳泊松比异常及其成因   总被引:4,自引:0,他引:4       下载免费PDF全文
利用地震层析成像方法可以提供地壳上地幔P波和S波速度扰动精细图像,进一步换算还可以得到泊松比的图像.但是,与P波和S波速度扰动图像相比,泊松比成像是否具有独特优点还有待研究.通过对华北东部进行了高分辨率地震层析成像研究,作出了该地区地壳速度结构和泊松比的图像,揭示了该区域存在一个高泊松比异常区,位于恒山-北太行-张家口...  相似文献   

17.
The paper presented the research on the dynamic advanced abutment stress induced by longwall mining with borehole stress meters on mining side coal mass. Twenty vibrating wire borehole stress meters were installed into the extracting coal mass wall of a first mining roadway of 910 m depth in Zhuji Coal Mine, China, and were used to monitor dynamic changes in vertical and horizontal stresses. Three months of continuous monitoring and further analysis showed that the impacting distance of advanced abutment stress induced by mining in the strike of the working face along its central axis was the farthest, greater than 250 m (the face length is 220 m); it gradually decreased in the radial direction of the face from its central axis outward; the pressure peak was located within 24 m in the front of the mining coal wall; non-synchronous caving of the layered mudstone roof at the stope occurred. Comparison between vertical and horizontal stress increments indicated that the horizontal stress was much smaller than the vertical stress in the coal mass of mining side, while the latter’s magnitude determined the drastic degree of mine pressure manifestation. The study has been applied to determine the advanced support length of the working face and further provide a reliable basis to forecast such dynamic disasters as rock burst, coal and gas outburst, etc., as well as to design the asymmetric supports on both sides of a gateway.  相似文献   

18.
长壁孤岛工作面冲击失稳能量场演化规律   总被引:1,自引:0,他引:1  
王宏伟  姜耀东  高仁杰  刘帅 《岩土力学》2013,34(Z1):479-485
煤矿冲击地压一直是困扰中国煤矿安全的主要问题,而煤矿开采过程中跳采形成的孤岛工作面由于容易产生应力集中,来压强度提高,极容易发生冲击地压。基于唐山矿T2193下孤岛工作面的地质条件,从数值分析的角度研究了煤岩体材料的非均匀性,揭示了孤岛工作面顶板周期来压时煤岩体能量释放的动态特征,分析了工作面前方能量释放激增机制。数值模拟结果显示,长壁工作面回采过程中直接顶的不断垮落造成了老顶悬空距离的不断增大,工作面周期来压时,积聚于老顶岩层内的弹性应变能将瞬间释放,容易引发工作面及巷道的冲击失稳。孤岛工作面由于其特有的矿压显现特征,老顶周期破断时所释放的弹性应变能将更加剧烈,冲击地压势必愈加强烈。孤岛工作面顶底板和煤层的能量释放激增可以作为判断煤岩体冲击失稳的前兆信息。孤岛工作面前方发生冲击破坏的主要原因是由于工作面回采过程中围岩所积聚的大量弹性能在顶板断裂时所伴随的巨大能量释放而造成的。  相似文献   

19.
Microseismic studies associated with a longwall coal mining operation are described. The mine under study was located some 600 ft. below surface. Seismic events associated with controlled roof failure, and with stress development in both the roof and adjacent pillars were monitored by a seven-station near-surface array. The studies were carried out over a 6-month period during which the longwall face moved horizontally some 800 ft. below the area defined by the seismic array. Brief details are presented of the mobile monitoring system and the analysis techniques employed. Typical results obtained during the study are discussed along with suggestions for improving future studies of this type.  相似文献   

20.
A systematic approach to numerically simulating an island longwall panel operation is proposed: it aims to investigate the evolution of overlying strata, static stress and displacement response and dynamic load arising from roof fracturing and fault slip. The results show that due to a small gob width (70 m) on both sides, the evolution height of overlying strata is limited, i.e. the heights of the cave-in zone and fracture zone are 30.98 and 66.91 m, respectively. The numerical model matches the theoretical analysis and field observations. Dynamic analysis reveals that the envelope of mine tremors confirms the good correlation with the evolution of the fracture zone. As the mining panel is far from the fault, fault slip does not occur; at this time, the dynamic load mainly comes from roof fracturing. When mining activities approach the fault, the calculation of the dynamic response of fault slip is performed over the area where the increase of relative shear displacement during dynamic analysis exceeds 0.05 m and where the shear stress along the fault decreases. It is shown that during the initial stage of the mining process, and in a square mining panel, fault slip is more likely to occur, leading to strong tremors and rock bursts, which become more notable in the later stages of the mining of the island panel.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号